Determine major milestones that the project will encounter

Assignment Help Project Management
Reference no: EM131497512

Assignment: Planning a Software Development Project

This assignment consists of two sections: a written project plan, and a project plan that is created through the use of MS Project. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for.

Imagine that you have been hired as a project manager assisting in the development of a mobile application and cloud-based solution which is designed to streamline your organization's delivery operation. As project manager, you are to manage the development and release of the mobile client platform in the cloud-based infrastructure that will use GPS tracking to track the shipment and delivery of goods in trucks across the United States.

The mobile client will have three modules consisting of a search customer screen, search address screen, and confirm delivery screen. Programmers have reviewed the requirements and estimate that each module will take 200 hours to complete by one programmer.

In addition to delivering the mobile-based application, your project will require upgrading the internal network and application infrastructure to a cloud-based model to support the new mobile platform. This effort will require your team to procure network appliances to optimize the security factors of the cloud-based platform.

One last component of the project scope is to provide training to operation support staff and fifty truck drivers staffed across four regions of the U.S. Your project team consists of two programmers, a technical writer, four technical trainers, two network engineers, and one system administrator.

Section 1: Written Project Plan

Write a three to four page paper in which you:

1. Determine the factors that must be considered and observed throughout the WBS development process and explain why.

2. Create a WBS for the scope of the project.

3. Analyze the various activities required for this project and provide an estimate of duration for each activity based on the number of resources available for the project. Include assumptions and basis for each estimate.

4. Recommend the estimation technique that should be used for each activity (i.e., PERT, Delphi, Analogy, Expert Judgment, or Rule of Thumb).

5. Determine the major milestones that the project will encounter.

6. Describe the logical sequence of planned activities required to achieve the project and analyze how monitoring durations on the critical path influence the success of the project.

Section 1 of your assignment must follow these formatting requirements:

• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

• Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

Section 2: Project Plan

Use Microsoft Project to:

1. Document all resources that would be required for this project within the Resource Sheet form within the software.
2. List all the activities required for the project. Break down the activities by the major milestones.
3. Enter the estimate of required durations, dependencies, and assign resources for each activity.
4. Generate a Gantt chart that shows all of the project deliverables, from beginning to end.

Reference no: EM131497512

Questions Cloud

Design a program that allow the user to enter number of room : Design a modular program that allows the user to enter the number of rooms that are to be painted, the approximate square feet of wall space in each room.
Find the minimum dc current and voltage : A parallel series electric bllasting circuit consists of six branches of eight caps each. Holes are spaced 10ft (3.1 m) apart in a rectangular pattern.
What would be the value of the fulton bonds : What would be the value of the Fulton bonds at an 8 percent required rate of return if the interest were paid and compounded semiannually?
What would net income and return on assets be for the year : Polly Esther Dress Shops Inc. can open a new store that will do annual sales volume of $1,220,400. What would net income and return on assets be for the year?
Determine major milestones that the project will encounter : Determine the major milestones that the project will encounter. Determine factors that must be considered and observed throughout the WBS development process.
Determine the yield-to-maturity : Determine the yield-to-maturity (to the nearest of 1 percent) if the bonds are purchased at the
Firm has an issue of preferred stock outstanding : If the current market price of the preferred stock is $62.50, the yield on the preferred stock is?
Describe three specific construction applications of a pc : Briefly explain the difference between construction utilizing a conventional construction contract and construction utilizing a construction management contract
Determine the systems requirements : HI5019 STRATEGIC INFORMATION SYSTEMS T1 2017 ASSIGNMENT - BUSINESS REPORT. Develop business requirements, Determine the systems requirements

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd