Determine if driver can clear the intersection safely

Assignment Help Civil Engineering
Reference no: EM13305220

The driver in problem 2 stops at an intersection with a two-way stop sign. Assume that the width of the intersection in 24 ft and the car is 20 ft long. If the driver's perception-reaction time is 0.75 seconds, determine if he can clear the intersection safely for the following conditions? (a) When the through traffic is quite heavy and the average gap between vehicles is 5 seconds. (b) If the average gap between vehicles increases to 10 seconds.

Reference no: EM13305220

Questions Cloud

Conduct an analysis on selected organisation : Overview of the organisation and the industry with its structure, products, and major business processes. Use a flowcharting diagram for each area as a supplement to your descriptions.
What is the current delivered by the generator : A stream turbine at an electric power plant delivers 4 500 kW of power to an electrical generator which converts 95% of this mechanical energy into electrical energy
Determine the flow of vehicles on the level section : From an aerial photograph, one observes that on a level section of a (multilane) highway, 25% of the vehicles are trucks, 75% are cars, and there are 50 vehicles per mile of highway. The trucks travel at 40 mph and the cars at 60 mph.
Customers owed the company $22,000 at year-end : 1. Customers owed the company $22,000 at year-end.
Determine if driver can clear the intersection safely : Assume that the width of the intersection in 24 ft and the car is 20 ft long. If the driver's perception-reaction time is 0.75 seconds, determine if he can clear the intersection safely for the following conditions
How many electrons hit the screen in given time : The current in an electron beam in a cathode-ray tube is measured to be 70 uA. How many electrons hit the screen in 5.0s
What is the net income annually for the plant : Due to efficiency, this was reduced 10%. The depreciation of the plant is 50,000 per year. Assuming a corporate tax rate of 40%, what is the net income annually for the plant?
Explain the managerial significance of the accounting : Assume the marina operator is unsophisticated in business. Explain the managerial significance of the accounting above to this person.
What is the total delay and the maximum queue length : Vehicles arrive at a freeway on-ramp meter at a constant rate of six per minute starting at 6:00A.M. Service begins at 6:00A.M. such that u(t)=2+0.5t, where u(t) is in veh/min and t is in minutes after 6:00A.M.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Which would require less wood and by what percentage

An engineer is to design a channel lined with planed wood to carry 2 m3/s of water on a given slope. The channel cross section can be either a 90 degree triangle or a square. Which would require less wood and by what percentage

  Determine what is the outlet air temperature

A total of 13,610 kg/h of air at 1 atm abs pressure and 15.6C is to be heated by passing over a bank of tubes in which steam at 100C is condensing. The tubes are 12.7mm OD, 0.61 m long, and arranged in-line in a square pattern with Sp=Sn= 19.05mm.

  Compression of a concrete cubes under friction

How do the crack behaves under the compression of a concrete cubes under friction between the plates and specimen with stress strain diagram?

  Determine what is the magnitude of the load p

A round bar of 6mm diameter is made of 6061-T6 aluminum. When the bar is stretched by an axial force P, its diameter decreases by 0.450 microns. what is the magnitude of the load P

  Calculate net present value

Set up life cycle diagram for both alternatives and calculate net present value (NPT) and annual cost for the life time.

  Determine the modulus of elasticity of the material

A tensile test was performed on a metal specimen having a circular cross section with a diameter of 0.50 inch. The gage length is 2 inches. For a load of 13.5 kips, the elongation was 4.66 x 10-3 inches.

  Calculate the runout length with an allowable stress

An 80-mil (2 mm) HDPE geomembrane with an allowable stress of 1,300 lb/in2 rests on a 3(H):1(V) side slope. A 18-inch thick cover soil with a unit weight of 110 lb/in3 (also unit weight of the back fill soil in the anchor trench) is placed of the ..

  Determine the minimum length of curve that can be designed

You are designing a highway to AASHTO guidelines on a rolling terrain where the design speed will be 60 mi/h. at one section, a +1.0% grade and a -3.0% grade must be connected with an equal-tangent vertical curve.

  Compaction degree by freezing

We would continue embankment work even if winter season and my question is what is swelling amount of compacted soil for 30cm thickness and 95% compaction degree by freezing.

  Determine value of force f which result in zero displacement

A rectangular steel bar shown is fixed at the right end has a thickness of 20 mm. The temperature is increased by 20C and a force F is applied as shown midway along the bar. Use the properties E=200 GPa, a=12(10^-6)/C.

  What is the total equivalent through volume on the approach

An intersection approach volume is 1,500 veh/h and includes 12% left turns with a through-vehicle equivalent of 2.3 tvu's/left turn. What is the total equivalent through volume on the approach

  How much heat must be supplied to maintain desired temp

A small building that shelters a water supply pump measures 2 m x 3 m x 2.4 m high. It is constructed of 1- cm thick wood having a thermal conductivity of 0.126 W*m^-1*K^-1.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd