Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Vehicles arrive at a freeway on-ramp meter at a constant rate of six per minute starting at 6:00A.M. Service begins at 6:00A.M. such that u(t)=2+0.5t, where u(t) is in veh/min and t is in minutes after 6:00A.M. What is the total delay and the maximum queue length?
Design a simply supported one-way reinforced concrete floor slab to span 10 ft and carry a service live load of 175 psf and a service dead load of 25 psf. Use fc' = 3000 psi and fy = 60,000 psi. Make the slab thickness to ½-in. increments.
Pore water pressure is to be observed during the construction of the embankment. Calculate the pore water pressure which must not be exceeded at any point in the clay layer 9 m below the surface of the embankment to ensure a shear strength of 100 ..
A 25-mm-diameter shaft .5 m long is pulled through a cylindrical bearing. The lubricant that fills the 0.3-mm gap between the shaft and bearing is an oil having a kinematic viscosity of 8.0 × 10-4 m2/s and a specific gravity of 0.91.
Normal load at failure was 93.8N with a maximum shear load of 38.7N. Find stresses on the failure plane, sketch a graph showing these on the shear stress and normal stress axes. Find the friction angle and shear strength.
While traveling around the curved path, the motorcyclist increases speed by 1.25ft/s^2 . Part A - Finding the time interval for the motorcyclist to reach a given acceleration If the motorcyclist starts from rest
(a) Use differentiation to find a general expression for the rocket's velocity as a function of time, (b) When is the velocity zero?
A laboratory consolidation test was performed on a clayey soil specimen, which was drained on both top and bottom. The time for 50% consolidation was 6.2 minutes, and the specimen's thickness at 50% consolidation was 0.740 in.
a mountain water reservoir in a national park is to provide water at a flow rate of Q= 200 gpm and a minimum pressure of 40 psig in the lodge of the valley 200 ft below the reservoir.
The slope of the channel is .15% and the mannings roughness coefficient is .038. estimate the depth 100m upstream of a section where the flow depth is 2.2m using the standard step method. Approximate how far upstream of this section would you exp..
A proposal has been submitted to replace a group of assembly workers, each working individually, with an assembly line. The following table gives the individual work elements. The demand rate for this job is 1600 units/week (assume 40h/week)
The coefficient of rolling resistance can be taken to be a constant for all speeds, equal to 0.008. If the cyclist is coasting down a 6% grade, what is the maximum speed attained
the flow rate into the lake is 10 m3/s, the surface area of the lake is 1 x 107 m2, and the rate of evaporation from the lake is 6 cm/wk, how long ago did the dumping stop?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd