Homework: Project Management- Work Breakdown Structure
Overview:
This homework is to create a work breakdown structure (WBS) for the project you selected. This is part of your Course Project.
Instructions:
Create a high-level WBS comprised of at least three levels:
I. Each level should have with a minimum of five level 1 tasks, with two level 2 tasks, and three (3) Level 3 tasks.
II. Describe each task (work package) in your WBS with just enough information so that everyone in the team can understand what each work package means.
III. Level Numbering:
1. Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0.
2. Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc.,
3. The third level of tasks should be numbered 1.1.1, 1.1.2, 1.1.3, 1.2.1, 1.2.2. 1.2.3 etc.