Define the project goals and customer deliverables

Assignment Help Project Management
Reference no: EM131871597

Assignment

This case study will ask you to use the DMAIC process for your process improvement project. The basis of this case study will follow Table 13-2 in your textbook, the Six Sigma process,

DMAIC:

1. Define the project goals and customer (internal and external) deliverables.
2. Measure the process to determine current performance.
3. Analyze and determine the root causes of the defects.
4. Improve the process by eliminating defects.
5. Control future process performance.

Provide at least one paragraph for each DMAIC step as noted above. Be creative and apply research, course concepts, tools, and techniques to help improve your process. Requirements of Submission: The case study assignments must follow these formatting guidelines: double spacing, 12-point Times New Roman font, and one- inch margins. Each case study should be one to two pages in length. Include at least two sources of research and follow APA guidelines for citations and references.

For this case study, use one or both of the following process improvements:

1. check sheet to collect data on the frequency or patterns of the events, problems, defects, defect location, defect causes, etcto narrow down the root cause of the issues andidentify corrective action

2. cause and effect analysis by Ishikawa

The basis of this case study will be based on the following:

A Closer look At Quality 13-2 D in Action

While Kevin Colby was working on a Six Sigma project at the Truck Components Automated Products Division of Eaton Corporation, the company was examining cost-savings opportunities. The division produced transmissions that included speed sensors, which measure shaft speeds and work in conjunc- tion with the gears produced by the Cleveland, Ohio-based company. The gears with holes caused signal fluctuations that affected the sensors. Two electronic control units (ECUs) with different circuit speeds were manufactured to allow the sensor to work with both types of gears.

Engineers within the division's design group who were involved with the gear project realized that they could simultaneously have an impact on two divisions. Jerry Ganski, principal engineer who led the effort to eliminate the second ECU, said, "We realized that removal of the holes in the gears would allow the Automated Products Division to eliminate the special ECU we had to manufacture to deal with the holes. We now use a common ECU for all our platforms and thus save the money it took to build, stock, and handle two ECU styles where the only difference between them was the speed sensor circuit. The savings is estimated at approximately 12 percent." Based on the improvements realized from these three projects, Eaton is investigating other gear-related projects for potential improvement opportunities.

Reference no: EM131871597

Questions Cloud

Draw difference shapes of the indifference curve : Patterns Consumer Theory - What is the equation for the lines? Write in symbols and explain in words. What two variables are on the axes
Company specializing in infrastructure projects : Infraworks Inc., a company specializing in infrastructure projects is preparing to submit its proposal to the Government of South Africa build a new airport.
Local businesses to declare bankruptcy and default on loans : An economic downturn causes 5 percent of the local businesses to declare bankruptcy and default on their loans.
What is your opinion of the article : What is your opinion of the article? How does the article relate to your experience or current job in the public or nonprofit sector?
Define the project goals and customer deliverables : Define the project goals and customer (internal and external) deliverables. Measure the process to determine current performance.
Par vale will affect which balance sheet accounts : The sale of a new common stock at a price greater than par vale will affect which balance sheet accounts? What stock price would you consider appropriate?
Determine which of porters generic strategies you will use : A competitive advantage is a product or service that an organization's customers place a greater value on than similar offerings from a competitor.
New equipment at the start of the project : Your company is considering a new project that will require 8000,000 of new equipment at the start of the project.
Develop a simple gantt chart to represent all of activities : Develop a simple Gantt Chart to represent all of activities associated with the party planning process. Assume you have 30 days to complete the entire process.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd