Define a work breakdown structure and describe

Assignment Help Computer Networking
Reference no: EM13888379

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview:

Imagine that you work as the project manager for an IT department. Your organization has recently approved the development of a mobile application. As the project manager, you will manage the development of the project. The project will include user experience (UX) design by a consultant, graphic design by a team of two contracted designers, and in-house application development by a team of three (3) programmers and a database developer.

Deliverable 1: Summary (MS Word or open source equivalent)

Write a one to two (1-2) page summary document in which you:

Summarize the project requirements and other assumptions (i.e., budget, human resources, workload, environmental dependencies, etc.).

Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

Use Microsoft Project or an open source equivalent to create a WBS which addresses the following:

Contain at least five (5) main tasks, one (1) for each of the PMBOK® process areas.

Contain at least thirty (30) line items distributed in five (5) or more work packages.

Contain Work Breakdown Structure Code for each task.

Present duration estimates for each task that results in a duration estimate for the project not to exceed the requirements described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date.

The cover page and the reference page are not included in the required assignment page length.

Reference no: EM13888379

Questions Cloud

What role does an information system play in today : What role does an information system play in today organizations?
Measure a supply chains performance : If fewer weeks of supply and higher inventory turnover are better, is it possible for a supply chain to achieve zero weeks of supply and infinite inventory turns? Why or why not? Discuss with reasoning.
What is the speed of the third fragment : A vase falls off a table and shatters into three fragments which move away horizontally across the floor. Fragment 1 has half the mass of the original vase and travels with speed 34.5 cm/s. Fragment 2 has one-quarter the mass of the original vase ..
What duties to church might bagley have violated : What duties to Church might Bagley have violated in this situation?Lundberg v. Church Farm, Inc. - case to refer to
Define a work breakdown structure and describe : Define a work breakdown structure and describe the methodology behind constructing one
What is the difference between dss and knowledge management : What is the difference between DSS and knowledge management?
What is the principal remaining-nominal compounded monthly : What is the principal remaining after 15 monthly payments have been made on a $23,000 four-year loan? The annual interest rate is 12% nominal compounded monthly. Please show all steps.
Minimize expected interest costs : If Condo needs to borrowmore money during the year, the company will have to go toLouie the Loan Shark. The cost per dollar borrowed from Louie is 25¢. To minimize expected interest costs for the year,how much money should Condo borrow from the ba..
What is the value of software? give several examples : What is the value of software? Give several examples of software you use at school or home.

Reviews

Write a Review

Computer Networking Questions & Answers

  If you had an enterprise organization

If you had an enterprise organization of 1000 users, and had to set up an intranet web server, which web server would you use? Please explain your answer. (I just need one good paragraph).

  Windows server 2012 firewall

From the e-Activity, take a position that the benefits of using the built-in Windows Firewall are or are not superior to those offered by third-party software products that boast similar features and integration with the Windows Server 2012 operat..

  What should the subnet mask

How would you implement availability in this network? From an efficiency perspective, what should the subnet mask be for the connection between R1 and R2

  Question 1a describe the following security services

question 1a describe the following security services confidentiality availabilityb explain known plaintext attack?c

  Make a power table for numbers mod 11

Make a power table for numbers mod 11. Indicate how the table shows Fermat's theorem, label the primitive roots mod 11. Explain how you can tell they are primitive roots. Label the rows that make good power ciphers and explain

  Illustrate the differences between pstn and voip what are

more and more people are starting to not have a pstn connection to their home for phone service anymore and instead

  Describe the osi reference model

Write the name of the layer next to the number to which it corresponds. Describe the function of each layer, purpose of each layer, and what hardware resides at each layer within at least one paragraph for each layer.Describe the OSI Reference Mod..

  An application-level and a circuit-level one

What is a gateway, and what is the difference between an application-level and a circuit-level one?

  Install backbone to connect four base-t ethernet lans

You have been hired by a small company to install backbone to connect four 100base-T Ethernet LANs (each using one 24-port hub) and to give a connection to Internet. Develop simple backbone and determine total cost.

  Expiration and garbage collection timersare

Router X does not receive any update for another 90s.  How many periodic, expiration and garbage collection timersare now running in router X?

  Identify application architecture in use by the organization

Identify the application architecture in use by the organization, and explain the basic mechanics of how that architecture works.

  Explain the basic components and media of network systems

Explain the basic components and media of network systems and summarize current networking standards and how standards bodies and the standardization process impact networking technology.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd