Define a work breakdown structure

Assignment Help English
Reference no: EM131340461

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview:

Imagine that you work as the project manager for an IT department. Your organization has recently approved the development of a mobile application. As the project manager, you will manage the development of the project. The project will include user experience (UX) design by a consultant, graphic design by a team of two contracted designers, and in-house application development by a team of three (3) programmers and a database developer.

Deliverable 1: Summary (MS Word or open source equivalent)

Write a one to two (1-2) page summary document in which you:

Summarize the project requirements and other assumptions (i.e., budget, human resources, workload, environmental dependencies, etc.).
Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

Use Microsoft Project or an open source equivalent to create a WBS which addresses the following:

Contain at least five (5) main tasks, one (1) for each of the PMBOK® process areas.

Contain at least thirty (30) line items distributed in five (5) or more work packages.

Contain Work Breakdown Structure Code for each task.

Present duration estimates for each task that results in a duration estimate for the project not to exceed the requirements described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date.

The cover page and the reference page are not included in the required assignment page length

Mobile App Part 2 (Gantt and PERT Charts)

Update the Microsoft Project file you created in Assignment 4: Mobile App Part 1 (Work Breakdown Structure) with the following changes:

Set progress in at least ten (10) of the line items.

Set the properties so that at least one (1) of the main tasks is behind schedule.

Create a Gantt chart for the project.

Take a screenshot of the Gantt chart which can later be inserted into your written paper.

Create a PERT diagram that identifies the critical path.

Take a screenshot of the PERT chart which can later be inserted into your written paper.

Note: If you need a tutorial on taking a screen shot, visit one of the following locations: PC Users Mac Users

Write a two to three (2-3) page paper in which you:

Compare and contrast the information that one receives from a Gantt chart, versus that of a PERT diagram.

Examine the advantages of using a Gantt chart over a PERT chart and vice versa. Determine when it is appropriate to use one over the other. Justify your response.

Explain the importance of the critical path in project management.

Insert the screenshots of the Gantt and PERT charts you created based on the provided criteria. Elaborate on the status of the mobile application development project based on the updated information. Note: The graphical representations do not count toward the overall page requirement.

Use at least one (1) quality resource in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Mobile App Part 3 (Risk)

Reference the Microsoft Project file you created in Assignment 5: Mobile App Part 2 (Gantt and PERT Charts) for the completion of this assignment.

Write a two to three (2-3) page paper in which you:

Document at least ten (10) total risks (two [2] risks for each phase of IT projects) of the mobile application development project.

Assess the likelihood of occurrence for each risk.

Assess the impact of each risk on the success of the project.

Identify an owner for each risk.

Recommend a strategy to manage each risk.

Reference no: EM131340461

Questions Cloud

Examples of servant leadership and world-changing : Think of the success story for a time when you were part of a team and you accomplished the goal or created the constructive change you set out to make happen. Share your story and answer the following questions in a 200-250 word discussion: i. Wh..
What is its premium or discount as percent of nav : The Stone Harbor Fund is a closed-end investment company with a portfolio currently worth $470 million. It has liabilities of $5 million and 10 million shares outstanding. If the fund sells for $45 a share, what is its premium or discount as a percen..
Identify the prepositional phrase : Identify the prepositional phrase, and tell whether it acts as an adjective or adverb - you can enhance and clarify your understanding by creating a graphic organizer that tracks.
What is its pretax cost of debt : Clifford, Inc., has a target debt-equity ratio of .71. Its WACC is 8.5 percent, and the tax rate is 34 percent. If the company's cost of equity is 11.1 percent, what is its pretax cost of debt?
Define a work breakdown structure : Imagine that you work as the project manager for an IT department. Your organization has recently approved the development of a mobile application. As the project manager, you will manage the development of the project. The project will include us..
Calculate the current drawn : When four identical hotplates on a cooker are all in use, the current drawn from a 240 V supply is 33 A.
Definition of and consequences for tardiness : Describe your expectations and processes for each procedure, as well as how and when you would teach the procedure to your class - Students and teachers need to have procedures for everything, based on the needs of the particular class.
What is the total resistance of the circuit : Two 20 Ω resistors are connected in parallel and this group is connected in series with a 4 Ω resistor. What is the total resistance of the circuit?
Draw the price yield curves for bond : Consider a bond (bond1) which matures in 30 years and a bond (bond2) which matures in 15 years. Both have a facevalue $100 and semi annunal coupon payment of 7%(2). Draw the price yield curves for bond1 and bond2 on the same yield-price plane with yi..

Reviews

Write a Review

English Questions & Answers

  Purpose of an appendix

Everyone, what is the purpose of an appendix? Might it be a good idea to drop contradictory information like this into a report's appendix?

  Write analysis of the novel the snowman by author jo nesbo

Write a 3-4 page analysis of the novel : "The Snowman" by author Jo Nesbo.

  Research about the cousins by joyce caroloates

Assignment to research about "The Cousins" by Joyce CarolOates. Provide the answers of the subsequent questions.

  Write a summary of the story what matter in america

Write a summary of the story "WHAT MATTER IN AMERICA".

  Write a review paper about changing the face of poverty

Write a review paper about "Changing the Face of Poverty" by Diana George.

  Film and theatre

Film and theatre rely on different technologies. Do you think special effects in film add or detract from the quality of a film? Has the introduction of CGI effects enhanced the quality of filmmaking or are the films of the past essentially better th..

  Discusses different types of drugs and even points out

Discusses different types of drugs and even points out that there are drugs that are legal (caffeine, tobacco) that are still addictive and have negative side effects.

  Write an assignment high level english

write the assignemnt in a really structured high level english because it s a graduate course and proofread

  Who is to blame for such inequality

How do media representations influence our understandings of the sources of economic inequality? According to these representations, who is to blame for such inequality?

  Perform a semiotic analysis of a print advertisement

Write an essay in which you perform a semiotic analysis of a print advertisement or television commercial.

  Explain whether your article was peer reviewed

How does an editor differ from a peer reviewer? Use at least two points to support your response. Based on this information, explain whether your article was peer reviewed?

  Analyze elements of fiction including symbolism and themes

Analyze the elements of fiction, including setting, characters, point of view, plot, symbolism, themes, tone and irony. Cite specific examples from the assigned stories for each element.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd