Purpose of the assessment

In-depth analysis of common issues that program/project managers often face in organisations that lack a culture that supports implementation of project management methodologies.

Purpose of the assessment:

Project management problems can occur when project management methodologies are not implemented successfully across organisations. In this assessment task, you are required to write a report on the current project management issues in the following case-study, in 800 to 1000 words exclusive of references.

RAPID PROTOTYPING - NEW DISCIPLINE

Rapid prototyping has been a constant growing and evolving field since the late 1980s. As technology improved, so did the opportunities in new markets. The idea quickly evolved from its grassroots beginning to many small companies competing for a bigger share of the growing market.

Frank Billings was just another name in what was at that time a niche market. As a student in engineering school, he followed the development of the new prototyping techniques and realized their potential in the marketplace. His dream job was to work for a rapid prototype equipment manufacturer. There were only a few start - up companies in rapid prototype machine development, however, and none could pay the average engineer wage.

Like most engineering school graduates overloaded with school loans, he couldn't wait for his dream job to come along, so he went for a job at Cocable Company. Cocable designed and manufactured specialty cable and cable - related products. It had nothing to do with rapid prototyping, but it paid well. He worked hard at Cocable and earned enough to pay down his debts. He proved to be an excellent engineer, earning a great reputation at Cocable and making many contacts along the way. In those three years at Cocable, however, he never stopped thinking about rapid prototype machines. He spent his free time coming up with a rapid prototype machine design, always dreaming of having his own company. Three years in, he was ready. He quit Cocable and started his own rapid prototype (RP) design business. He perfected his own RP machine design and was ready to prove himself in the growing field.

BUSINESS BOOMS

Like every start - up business in a new field, finding customers is tough. In the RP field, there are two types of work. The first includes owning an RP machine and doing prototypes per order. The second is selling RP machines to businesses that want the machine to do in - house RP. The latter option is far more profitable since the machines are more expensive than each prototype they produce. Frank would have been happy with either type of business, since at the time, he wasn't doing much business at all.

All those years making contacts at Cocable Company proved to be worth the time and effort. He had stayed in touch with these contacts and through them was happy to learn that Cocable had just been hired by GE to design and manufacture cable installations on their newest jet engine. Part of the wiring installation that Cocable had been hired to design included junction boxes and switch covers. The installation would be no simple task as these " boxes " are made of specialty materials with complex shapes and multiple designs, all needed for application. They had to be perfect from the start since airplane engines have no room for error. This was a huge job and the timeline was tight. Rapid prototypes were an absolute necessity for this job. Frank's knowledge of Cocable's needs made him perfect for the RP job.

Cocable wanted full access to rapid prototyping so they decided to contract Frank to custom build four RP machines to their specifications. Frank could not be happier. The RP machine specs were given to Frank and he went to work.

WHO IS GOING TO PAY FOR THE CHANGES?

After three months of all - night work sessions, the machines were built to specification and ready for delivery to Cocable. Frank ' s daring steps into a new field were fully rewarded, he thought.
Everyone was ready for a test run, after the first machine was delivered to Cocable. The CAD model was loaded and it was time to hit the "Start" button.

Beep, beep, beep.

"That's not good, " said Frank.

He felt embarrassed that the machine failed in front of everyone. He was sure the machine ran fine before it was delivered. He couldn't allow his first major deal to fail in any way. The machine was checked over for shipping damages. The connections were double - checked. Everything appeared intact. Frank sat down to review the CAD model and discovered the problem. The model was 62 inches long. This was an issue, considering the RP machines were designed for a maximum of 55 inches.

The original Cocable specs for Frank's RP machines were for a maximum length of 48 inches. Frank optimized his machines for a length of 48 inches, but to be on the safe side, the machines were capable of 55 - inch designs. Sixty - two inches went outside that range. A machine that could make prototypes that long would require completely different processors, actuators, and adhesion processes. This would be a major redesign of the RP machines. This would take time and a lot of money.

Cocable claims that the original specs for a maximum of 48 inches came from GE. GE claims that it never gave Cocable a maximum length. The first design that GE requested from Cocable was 62 inches long and that had been weeks before. Cocable should have double - checked their RP specs. Nobody wants to take the blame for specifying the prototype design sizes and Frank's first major product is now going nowhere. Everyone is dissatisfied and two things are for sure: (1) The entire project is running late, and (2) it will be way over budget.

You are a Project Management consultant, and have been commissioned to write a report on this case. Write the report to address the following questions.

Questions to be addresses in the report:
1. What lessons can be learnt from this case?
2. Who do you think should pay for the changes?
3. What could have been done to make sure that the project scope was correct?

Verified Expert

The paper discusses the three questions asked at the end of the paper, what we learnt from the case, who will bear the loss and what steps would have taken to resolve the issue. All the question has been answered. Introduction, recommendation and conclusion is provided.The paper is prepared for 1000 words excluding bibliography

Reference no: EM131616864

Questions Cloud

Evaluate companys past performance marketing their product : Evaluate the company's past performance marketing their product using the six pillars of the marketing code of ethics.
Compute the number of preferred shares that were issued : Compute the number of preferred shares that were issued during 20X6. By what amount did the company's paid-in capital increase during 20X6?
Determine rate of total heat transfer through the window : Consider a 1.2-m-high and 2-m-wide glass window with a thickness of 6 mm, thermal conductivity k = 0.78 W/m.K, and emissivity e = 0.9.
Determine the rate of heat transfer from the plate : Consider a 2-ft × 2-ft thin square plate in a room at 75°F. One side of the plate is maintained at a temperature of 130°F, while the other side is insulated.
Current project management issues : MN601 - Network Project Management - Who do you think should pay for the changes and what could have been done to make sure that the project scope was correct?
Define plate midpoint temperature for black oxidized surface : A 0.5-m-long thin vertical copper plate is subjected to a uniform heat flux of 1000 W/m2 on one side, while the other side is exposed to air at 5°C.
Explain a united states army brigade is now : The use of military forces was supported by a DOJ memo, though most commentators disagreed, saying such law enforcement activities
Determine the heat flux subjected on the plate surface : A 0.5-m-long thin vertical plate is subjected to uniform heat flux on one side, while the other side is exposed to cool air at 5°C.
Drug therapy of iv furosemide : Drug therapy of IV furosemide, enalapril, metoprolol, and morphine sulphate was started for Mrs. J to control her symptoms.

Reviews

inf1616864

10/12/2017 5:02:25 AM

This assignment was good one with good marks, really appreciate the expert, Assignment passed. Thank you all for the help. the lecture was happy with the assignment. Thank you once more.

len1616864

8/28/2017 7:41:31 AM

Marking criteria: You must use the section heading given in the following marking criteria, and sub-heading as appropriate for your answer. Marking criteria: Section to be included in the report Description of the section Marks Introduction Executive summary and background of the case study 5 Case Study Assessment List, and analyse the project management problems and their possible causes. 20 Recommendations What should have been done to avoid the above problems? 10 Conclusion A summary of the report, and the main conclusion. 5 Reference style Follow IEEE reference style 5 Total 45

len1616864

8/28/2017 7:41:22 AM

Analyse Logic is clear and Consistency Mostly Adequate Argument is easy to follow with logical and consistent cohesion and confused and /10 strong arguments convincing logical and conviction disjointed convincing Design All elements are Components Components Most Proposal lacks present and very present with present and components structure. /10 well integrated. good mostly well present cohesive integrated Evaluate/justific Excellent use of Extremely Good effort Made some Very little ation creditable sources. good effort made but not effort. For attempt to Accurate outstanding example, Web reference. Lazy referencing. searches only effort with /5 Obvious that inaccuracies outstanding effort made Conclusion Logic is clear and Consistency Mostly Adequate Argument is easy to follow with logical and consistent cohesion and confused and /5 strong arguments convincing logical and conviction disjointed convincing Reference style Clear styles with Clear Generally good Sometimes Lacks excellent source of referencing referencing clear consistency /5 references. style style referencing with many style errors

len1616864

8/28/2017 7:41:16 AM

Example Marking Rubric for Assignment #: Total Marks 50 Note: The marking rubrics varies for each assignment Grade Mark HD 40-50 DI 35-44 CR 30-34 P 25-29 Fail <25 Excellent Very Good Good Satisfactory Unsatisfactory Introduction /5 All topics are pertinent and covered in depth. Ability to think critically and source material is demonstrated Topics are relevant and soundly analysed. Generally relevant and analysed. Some relevance and briefly presented. This is not relevant to the assignment topic. Identification Demonstrated Demonstrat Demonstrated Demonstrated Did not excellent ability to ed excellent ability to think ability to think demonstrate /10 think critically and ability to critically and critically and did ability to think sourced reference think sourced not source critically and material critically but reference reference did not source appropriately did not material material reference source appropriately appropriately material reference appropriately material appropriatel y

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd