Critical analysis of a project management plan

Assignment Help Project Management
Reference no: EM131067275

Assignment-

TOPIC: Critical analysis of a Project Management Plan (PMP)

PART 1: CRITICAL ANALYSIS OF THE PROJECT MANAGEMENT PLAN

Executive Summary (200-250 words but this does not form part of the assignment word count). The executive summary comes before the table of contents. Read the guidelines and provide a formal Executive Summary with details of why the report was prepared, how it is structured, and what the important findings, conclusions and recommendations are. The Executive Summary relates to the analysis only. (SUGGESTION: this should be written last after you have finished the report.)

Table of contents: This should be a full listing with respective page numbers of executive summary, introduction, main sections, references, individual appendices, and full listing of all figures and tables.

1. Introduction (250 words): Briefly state why your report has been prepared, what project is being analysed, and how the report is structured. (Note - this may be similar to the introduction in assignment 1 if you have used the same project, but this is a new report, and you need to provide the information your reader needs to understand the report. You can use the same information in both assignments. There is no need to reference assignment 1 if you are using your original work.)

2. Project background (250 words): Your project description should describe the project and its context - what organisation is the project owner/sponsor, what this organisation does, why the project is being done, where it is located, etc. The description should contain enough detail for the reader to understand the reason behind each of the components of the plan - why it is included and its content and format.

3. Audience and structure of the Project Management Plan (1000-1500 words approximately)
 
3.1 Provide a critical analysis of who is intended to be the main audience of the PM plan? What do they need to know? How will they use the plan? What information needs to be provided?

3.2 What alternatives exist for the structure of a PM plan (examine and compare a range of theories and opinions here)? How should that information be provided? In what sequence? What does the theory say?

4. Contents of the Project Management Plan (1000-1500 words approximately)

Provide a critical analysis of the major sections of the plan and provide some theoretical framework for what is included in each section (e.g. Why has a project schedule been included, is it a meaningful document, was it prepared by the right people, does it contain the right information, etc.?) This explanation will be drawn from the study modules, text book, selected readings, and other sources. This discussion will probably cover most, if not all, knowledge areas covered under the Guide to the Project Management Body of Knowledge (PMBOK Guide) (PMI 2013) in one form or another. It does not have to be under those headings but should clearly indicate that it covers all recognised areas covered by the various Project Management Bodies of Knowledge.

5. Conclusions (250 words): Summarise your findings from the analysis of your project management plan. What did you find out about the project plan? Does it conform to the recognised theory? What aspects are important and are of significance to project outcomes? What are its strengths and its weaknesses? (Focus here on the project plan and not on the theory).

6. Recommendations (250 words): What are your recommendations flowing from this analysis with regard to your chosen PMP? What changes should be made to your PMP for this project (or similar future projects)? Address the shortcomings identified in the conclusions. Again, focus on recommendations related to your PMP and not on the project itself.

List of references: Provide a complete list of references providing full details of all citations used in the body of the assignment.

Appendices: The PMP you have analysed will be attached as Appendix 1 (see below). Attach any additional appendices that relate specifically to the analysis following appendix 1. They should be numbered sequentially in the order in which they appear (Appendix 2, etc.).

PART 2: APPENDIX 1 - THE PROJECT MANAGEMENT PLAN

Appendix 1 should ideally be an actual project management plan for your chosen project and would be the sort of document that would be handed to a client/manager to illustrate how it is intended to manage the project through to completion. A project plan is often used to gain sponsor/client commitment, and should contain sufficient information to allow such a decision to be made with confidence. Make sure you understand what a project management plan is before you select a document for analysis.

It might be a document that you create yourself for this assignment or it might be an existing plan from your place of work or from another source if you don't have access to one from your workplace. Either way,the source should be clearly indicated.

Reference no: EM131067275

Questions Cloud

Velocity of the merry-go-round : The merry-go-round rotates with an angular velocity of 1.6 rad/s.The child then walks towards the center of the merry-go-round and stops at a distance 0.72 m from the center. Now what is the angular velocity of the merry-go-round? Answer in units ..
Explain the extrinsic vs intrinsic muscles : Explain the Extrinsic vs intrinsic muscles. Muscles can be divided into two distinctive groups; intrinsic and extrinsic. Extrinsic and intrinsic muscles are located in places such as the tongue, larynx, back, hand and foot muscles.
Difference in intellectual capacity and technical knowledge : This is an opportunity to make a connection with the course material in a creative way. Think of PRT experiences you have had that relate to what the authors discuss in the readings, and share connections and insights from your own personal experi..
Different medium the process is known as what : 1) When light bends as it enters a different medium the process is known as what? 2) A magnifying glass is what type of lens?
Critical analysis of a project management plan : Briefly state why your report has been prepared, what project is being analysed, and how the report is structured. (Note - this may be similar to the introduction in assignment 1 if you have used the same project, but this is a new report, and you..
Explain the rotator cuff supples stability to the shoulder : The rotator cuff supples stability to the shoulder and enables the shoulder to rotate up and down. The rotator cuff is not just one muscle but it consists of four scapular muscles.
Spectrum of the helium atom : How does the spectrum of the hydrogen atom differ from the spectrum of the helium atom?
Record the above transactions for a retail store : Apr. 2 Purchased merchandise from Lyon Company under the following terms: 53.400 price. invoice dated Apnl 2. credit terms of 2115. n160. and FOB shipping point
Determine the final velocity of a car : Determine the final velocity of a car that starts from rest and moves at an acceleration of 6m/s/s for 10 seconds.

Reviews

Write a Review

Project Management Questions & Answers

  Risk analysis and assessment procedures in healthcarewhat

risk analysis and assessment procedures in healthcarewhat are some of the procedures for analyzing risk within

  Replenishing an atm by bank

How much cash should the bank keep at an ATM if its annual cost of money is 10%? How often should the bank replenish an ATM?

  What it management changes should leslie request

What IT management changes should Leslie request that would likely increase the success of the IT acquisition projects and describe for each change why it would likely increase IT project success.

  Discuss how often a project schedule should be reviewed

In this discussion, please address the following: Discuss how often a project schedule should be reviewed. Should a project schedule only be reviewed by the project manager and project management team

  Globalcom products spam filter

The Globalcom product's spam filter requires a different network configuration than is currently in place for the network

  Explaining projects assist organizations

How do projects assist organizations and people to accomplish things?

  Which one of the following list is a hygiene factor

Frederick Herzberg propounded the Motivation-Hygiene Theory which classified workplace factors as motivators and hygiene factors (causing dissatisfaction). According to this theory, which one of the following list is a hygiene factor

  Solution to risk

How can one describe that some of the most successful global brands belong to mega-corporations like GE, Coca-Cola, Pepsi, Nestle, Siemens, Sony, etc..

  Area of project risk and procurement management

Demonstrate an understanding of the importance of procurement for global organisations operating in complex market environments

  Evaluate the best conflict resolution mode for each of the

evaluate the best conflict resolution mode for each of the following situationstwo of your functional team members

  Project management control issuescan you help answer the

project management control issuescan you help answer the question identify project management control issues?project

  Write a project plan description mission scope measurement

write a project plan description mission scope measurement managementselect a project that you would like to see

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd