Reference no: EM131403433
Assignment Project
Pick a reasonably complex system to use as your semester project. It can be any one of the examples or a system that you chose.
Examples include:
• Radar systems - ground based, air bases or space based
• Drones or robots - underwater, on land or airborne for surveillance
• Lighter than air balloons for surveillance
• Satellites - any mission
• Power or fuel plants
• A completely automated house
• Automated Information Exchange System - provides commuters a safe and streamlined post-accident process for drivers and insurers
• Building a home
• Portable Display System for a complex system
• Vehicle Fog Elimination System
• Outdoor Sound Submersion system
• Home Theatre Design
• Uninterrupted Power Supply Facility Design
• Implementation of a low cost satellite system for Search and Rescue, surveillance, etc
• Automotive Traction Control System
• All in one bike system
• Building a new All-Terrain Vehicle system
• All electric Trail Bike system
• Wireless workout device
Once your system is approved, you will:
1. Write an acceptable mission statement for your system. Use the Firesat example shown in class. You may not proceed to step 2 until I approve your statement.
2. Write 10 system performance requirements
3. Write 5 subsystem performance requirements for each of 2 subsystems
4. Create a functional block diagram for your system (use only verbs)
5. Create level 3 product Work Breakdown Structure.
6. Create a risk matrix for your top 5 technical system risks. Show and explain how these risks will be mitigated. Cost and schedule are not to be used as risks
7. Create a technical performance measure graph for your highest technical risk and explain the graphic.
8. Explain in bullet form how you will verify the system (Is it built to requirements)
9. Explain in bullet form how you will validate system performance (Customer Acceptance)
10. Describe in detail 2 trade studies that you would conduct to reach a final decision on your system architecture.
11. Create a top level system architecture drawing of you system. Include all subsystems.
Your final product will be a minimum of a 25-page power point presentation that contains at least all of the above assignments. See the Table of Contents example below
The course schedule will indicate the dates on which each assignment is due.
EXAMPLE TABLE OF CONTENTS
1.0 Introduction
1.1 Project Description
1.2 Project Objectives
1.3 Stakeholders
2 System Formal Design Process
2.1 Mission Statement
2.2 Mission Level Requirements
2.3 Mission Elements
2.4 Subsystem Elements
2.5 Subsystem Requirements and Descriptions
2.6 Functional Analysis Flow Diagram
2.7 Work Breakdown Structure
2.8 Risk Analysis
2.7.1 Technical Performance Measures
2.9 Drawing of System Architecture
2.10 Description of Trade Studies to be accomplished
3.0 System Integration and Test
3.1 System Interfaces - N2 Diagram
3.1.1 Interface Block Diagram
3.2 Integration Plan and Integration Flow Diagram
3.3 Test Plan and Test Flow Diagram (how will you test your design)
3.4 Acceptance Test Criteria (how will you get the customer to accept the product)
4.0 Conclusion
5.0 References
6.0 Appendices (if necessary
List of Figures
List of Tables.
Attachment:- Attachments.rar
|
When selecting a medium for a message and email
: When you stare at a blank page or a blank computer monitor without a clue of how to begin a composition, you are- Which would be the best way to persuade your boss to implement a flex-time schedule in your office?
|
|
Electric potential at a point
: Consider two coaxial rings of 22.6 cm radius and separated by 34.2 cm. Find the electric potential at a point on their common axis midway between the two rings, assuming that each ring carries a uniformly distributed charge of 3.91 µC. The value o..
|
|
Order of magnitude for the angular speed of the proton
: Look up the magnetic dipole moment of a proton and an order of magnitude for its radius. Assume the proton is a sphere with a uniform surface charge density, calculate an order of magnitude for the angular speed of the proton?
|
|
Write a matlab program to plot the probability mass function
: EECS 3300- Write a MATLAB program to plot the Probability Mass Function (PMF) of the following discrete random variables; Geometric with p = 0.6. Poisson with λ = 5 (Note, λ = np). Binomial with n = 10, p = .4.
|
|
Create level three product work breakdown structure
: Write 10 system performance requirements. Write 5 subsystem performance requirements for each of 2 subsystems. Create level 3 product Work Breakdown Structure.
|
|
What is the acceleration of the aircraft
: 1. The catapult on an aircraft carrier can take an aircraft weighing 300,000 N from 0 to 180 mph in 12.7 seconds, at which time the aircraft launches. What is the acceleration of the aircraft when it launches? Express your answer in the MKS system..
|
|
What is the total outward force on the window
: A viewing window on the side of a large tank at a public aquarium measures 52 in. by 62 in. The average gauge pressure from the water is 6 psi. What is the total outward force on the window?
|
|
What is the magnitude of the acceleration of the two boxes
: 1. What is the magnitude of the acceleration of the two boxes? ________m/s2 2. What is the force exerted on mB by mA? In other words what is the magnitude of the contact force FC? _______N
|
|
Do such positive externalities lower social welfare
: According to the "Positive Externality: The Superstar Effect" application, other teams benefited financially from having one team employ Michael Jordan. Do such positive externalities lower social welfare? If not, why not? If so, what could the te..
|