Case study - CBN Railway Company

CEO John Spychalski is concerned about a problem that has existed at CBN railroad for almost 20 years now. The continuous problem has been that the locomotives used by the company are not very reliable. Even with prior decisions to resolve the problem, there still has not been a change in the reliability of these locomotives. Between 2006 and 2007, 155 new locomotives were purchased and one of CBN's repair shops was re-novated. The renovated shop has been very inefficient. Spychalski estimated that the shop would complete 300 overhauls on a yearly basis, but instead it has only managed to complete an average of 160 overhauls per year.

The company has also been doing a poor job servicing customers (that is, providing equipment). CBN has averaged only 87 to 88 percent equipment availability, compared to other railroads with availability figures greater than 90 percent. Increased business in the rail industry has been a reason for trying to reduce the time used for repairing the locomotives. CBN's mean time between failure rate is low-45 days-compared to other railroads whose mean time between failure rates is higher than 75 days. This factor, Spychalski feels, has contributed to CBN's poor service record.

CBN is considering a new approach to the equipment problem: Spychalski is exam-ining the possibility of leasing 135 locomotives from several sources. The leases would run between 90 days to 5 years. In addition, the equipment sources would maintain the repairs on 469 locomotives currently in CBN's fleet, but CBN's employees would do the actual labor on the locomotives. The lease arrangements, known as "power-by-the¬mile" arrangements, call for the manufacturers doing the repair work to charge only for maintenance on the actual number of miles that a particular unit operates. The company expects the agreements to last an average of 15 years. John Thomchick, the executive vice president, estimates that CBN would save about $5 million annually be¬cause the company will not have to pay for certain parts and materials. Problems with the locomotives exist throughout CBN's whole system, and delays to customers have been known to last up to five days. Spychalski and Thomchick feel that the leasing arrangement will solve CBN's problems.

CASE QUESTIONS

In 200 - 250 words, address the following question:

"Do you think that the decision to lease the locomotives was the best decision for CBN"?

Reference

Coyle, J., Novack, R.A., Gibson, B.J., & Barbi, E.J. (2011). Transportation: A Supply Chain Perspective (7th ed). Mason, OH: South-Western Cengage Learning.

Verified Expert

In the attachment of solution contains around 250 words including references, The Topic of case study is "CBN Railway Company" is solved with the given problems.

Reference no: EM13964769

Questions Cloud

How many wavelengths of sound are contained in this distance : Assuming that the sound frequency is 523 Hz, how many wavelengths of sound are contained in this distance?
Calculate the divergence and curl of the vector field : Use Green's theorem to calculate the work done when a particle is moved along the helix x = cos t, y = sin t, z = 2t from (1,0,0) to (1,0,4pi) against the force F(x,y,z) = -yi +xj +zk.
Spend and wants to earn dividends : Gretchen Schmidt plans to buy shares of two stocks. One costs $32 per share and pays dividends of $1.20 per share. The other costs $23 per share and pays dividends of $1.40 per share. She has $10,100 to spend and wants to earn dividends of $540. H..
Discuss the stability of resulting atmospheric temperature : At night, the surface temperature over land drops by 10 K (to 300 K), the surface temperature over the ocean remains the same (306 K), and the temperature at 0.5 km over both land and ocean drops by 5 K (to 300 K for both). Discuss the stability o..
Case study - cbn railway company : Do you think that the decision to lease the locomotives was the best decision for CBN - Case study - CBN Railway Company
Gauss-jordan elimination to solve the system : Set up the augmented matrix while using Gauss-Jordan elimination to solve the system. Provide some notation showing how to proceed from one augmented matrix to the next.
Find the magnitude of the electric flux through the sheet : A flat sheet is in the shape of a rectangle with sides of lengths 0.400 m and 0.600 m . The sheet is immersed in a uniform electric field of magnitude 74.5 N/C that is directed at 20 degrees from the plane of the sheet. Find the magnitude of the e..
Amount of labor-hours based on shifts : Write a matrix A that denotes the amount of labor-hours based on shifts and each type of labor (carpenter, electrician, or plumber). Write a column vector B representing labor costs per shift.
What is allowable power dissipation from the upper surface : From wind tunnel tests under the same flow conditions , the average frictional shear stress on the upper surface is determined to be 0.0625N/m^2. What is the allowable power dissipation from the upper surface of the board if the average surface te..

Reviews

Write a Review

Project Management Questions & Answers

  Identified twenty-five top key critical safety risk factors

Could you share with us whether any of these risks were specifically applicable to an infrastructure project (or any other project) you were involved with?

  Market entry strategy project presentation

Market Entry Strategy Project presentation.

  Determining early and late start and finish times

Determine the early and late start and finish times and the slack times for the activities. Identify the critical path.

  How would you identify a key stakeholder

The first step in building a communication plan is to identify your key stakeholders and how would you identify a key stakeholder?

  Question related to systems analysis

Prepare a paper that analyzes an IT work-related project or fictitious project using systems analysis for a selected business system at the department or division level.

  Identify the problems associated with the project

Show how project management principles were used to reach project goals in the face of adversity.

  Stakeholder analysis for a communication management

stakeholder analysis for a communication management planwhat items should a communication management plan address? how

  What role should external factors of demand play

What role shouldexternal factors of demand play in successful business models? NOTE: first fully define the role and then analyze or discuss. At least 4 paragraphs.

  New information systems are built as solutions to problems

new information systems are built as solutions to problems or means for improvement.your task is to use laudon amp

  Important information about project management tools

How could you use scheduling tools, such as Microsoft Project and Important information about Project Management Tools

  Operations management-aggregate production planningplan

operations management-aggregate production planningplan production for a four-month period february through may. for

  Describe the scope of the project

Describe the scope of the project and control measures. Describe the goals and objectives of the project

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd