Calculated the change in vertical effective stress on the

Assignment Help Civil Engineering
Reference no: EM13548150

A culvert is to be constructed in a bed of sand (e = 0.5) for drainage purposes. The foof of the culvert will be located 3 m below ground surface. Currently the groundwater level is at ground surface. But, after installation of the culvert, the groundwater level is expected to drop 2 m below ground surface. Calculated the change in vertical effective sress on the roof of the culvert after installation. You can assume the sand above the groundwater level is saturated.

Reference no: EM13548150

Questions Cloud

Determine the allowable soil pressure for a maximum settle : A square footing 6ft by 6ft is to be installed 6ft below ground level on a sand stratum. Standard penetration tests were conducted on the construction site
Find the flow rate if the pump puts 22 hp in to the flow : A 110 f t long, 5 in in diameter (f = 0:033) connects two reservoir whose water surface elevations differ by 12 f t. Compute flow rate in pipe.
Express the approximate alkalinity of this water as mg : A water sample has bucarbonate concentration of 220 mg/l ( HCO3- )and the PH of the water is 7.9 > Express the approximate alkalinityof this water as mg/l of CaCO3
Find all contact forces : Cylinders A & B weigh 500N each and cylinder C weighs 1000N. Assuming frictionless contact between all surfaces, find all contact forces. Diameters A&B= 1, C=2
Calculated the change in vertical effective stress on the : A culvert is to be constructed in a bed of sand (e = 0.5) for drainage purposes. The foof of the culvert will be located 3 m below ground surface. Currently the groundwater level is at ground surface.
Find the z components of the electric field : An electron has an initial velocity with an x component of zero, a y component of 9.35 km/s, a z component 16.1 km/s, and a constant acceleration of 1.60 x 1012 m/s2 in the positive x direction in a region in which uniform
What is the probability that the maximum wind pressure will : A large parabolic antenna is designed against wind load. During a wind storm, the maximum wind-induced pressure on the antenna, P, is computed as P= 1/2CRV^2 Where C = drag coefficient, R = air mass density in slugs/ft3, V = maximum wind speed in ft/..
Determine the stretch of the cord when the system : The two disks each have a mass of 25kg and are attached at their centers by an elastic cord that has a stiffness of k = 1.6kN/m . Determine the stretch of the cord when the system is in equilibrium
Discuss the minimum alignment required to establish the : Explain the process for establishing a centerline for a roadway for an existing road. Include a description of the types of property markers used as well as any problems a surveyor may encounter in this process

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the speed of the car when s starting from rest

The 2 Mg car is being towed by a winch. If the winch exerts a force of T=105s on the cable, where 14m is the displacement of the car in meters, determine the speed of the car when s , starting from rest. Neglect rolling resistance of the car.

  How long would it take to obtain a reduction in bacteria

In a study it was found that 39% of the bacteria died within 9 hoursand 67% died within 20 hours. If the rate of andwer proportional to the number remaining, how long would it take to obtain a 99.9% reduction in the bacteria

  Terminal docks include casual workers who are hired tempor

In an Less-than-Truckload trucking company, terminal docks include casual workers who are hired temporarily to account for peak loads. At the Omah

  How to determine the scale reading at t

A large tank is used to calibrate the reading from a flow meter. Measurements of the system weight as a function of time are made. Water enters the tank vertically from the flow metering system at a speed of 20 ft/sec through a 1.5 in.

  Determine the largest magnitude of the force at a

the cantilevered wild- flange steel beam is subjected to the concentrated force P at its end. Determine the largest magnitude of this force so that the bending stress developed at A does not exceed 180 MPa.

  Determine the increment of vertical stress at all points

Constructing the foundation causes changes in the levels of vertical stress at all points in the soil. One such point lies at the centre of the footing plan and is at a depth of 10m. Determine the increment of vertical stress there.

  Determine the students final angular velocity

This causes the student to begin to rotate. Find the student's final angular velocity. The moments of inertia of the wheel and of the student are 0.313 kg · m2 and 2.09 kg · m2 respectively.

  Calculate the water pressure and velocity on the top floor

Water at a pressure of 13 atm, at street level, flows into a building at 3m/s through a 6 cm diameter pipe. The pipe tapers down to a 2 cm diameter by the top floor 50 m above.

  Estimate the wet density

A sample of natural glacial till was taken from below the groundwater table. The water content was found to be 52%. Estimate the wet density,dry density,buoyant density,porosity,and void ratio. Clearly state any necessary assumptions.

  Develop an estimate of the volumetric flow rate of air

Develop an estimate of the volumetric flow rate of air that will be required for aeration of the mixed liquor in an activated sludge system.For this calculation, assume that the (ultimate) CBOD is 200 mg/L and (ultimate) NBOD is 50 mg/L.

  Coefficient of permeability of concrete

How does aggregate size influence the coefficient of permeability of concrete? List other factors that determine the permeability of concrete in a structure.

  Plan your field geotechnical instrumentation scheme

Plan your field geotechnical instrumentation scheme. Plot your instrumentation systems on a cross section of your embankment and fully justify your answer. Also remember that you need to obtain the maximum data with the minimum cost?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd