Calculate the mass emissions rate of ash into the atmosphere

Assignment Help Civil Engineering
Reference no: EM13299817

Five million kilograms per day of coal are burned in an electric power plant. The coal has an ash content of 12% by mass. Forty percent of the ash falls out the bottom of the furnace. The rest of the ash is carried out of the furnace with the hot gases into an electrostatic precipitator (ESP). The ESP is 99.5% efficient in removing the ash that comes into it. Draw a diagram representing this process and calculate the mass emissions rate of ash into the atmosphere from this plant.

Reference no: EM13299817

Questions Cloud

Advise periwinkle of its fbt consequences : How would your answer to (a) differ if Emma used the $50,000 to purchase the shares herself, instead of lending it to her husband and advise Alpha of the income tax consequences arising out of the above information for the 2013-14 income year.
Calculate the engineering stress for the bar : Calculate the following for the bar:a) engineering stress at 0.001 (0.1%) strain, b) elongation, c) Young's modulus, d) final diameter of the bar Note: Poisson's ratio is 0.31 for 4140 steel, e) true stress, f) true strain.
Explain the concentration of the first ion that precipitates : A solution contains .10 M iodide ion, I- and 0.10 M carbonate ion, CO32-.... a. If solid Pb(NO3)2 is slowly added to the solution which salt will precipitate first, PbI2 or PbCO3? What will the concentration of the first ion that precipitates when..
Calculate the maximum design load on a hollow aisi : Calculate the (maximum) design load on a hollow AISI 1020 steel shaft with an outside diameter of 2.5 inches and an inside diameter of 2 inches. Assume a safety factor of 2.
Calculate the mass emissions rate of ash into the atmosphere : The coal has an ash content of 12% by mass. Forty percent of the ash falls out the bottom of the furnace. The rest of the ash is carried out of the furnace with the hot gases into an electrostatic precipitator (ESP).
What fraction of the original light is absorbed by analyzer : The transmission axis of the analyzer makes an angle of 32.0° with the axis of the polarizer. What fraction of the original light is absorbed by the analyzer
Determine the distance from the left hand end of the beam : Draw the shear force and bending moment diagrams for the beam, making sure to include values for the maximum positive and negative bending moments and their locations. Also determine the distance from the left hand end of the beam to the point whe..
What is the frequency of the beacon observed on spaceship : A spaceship is approaching a space station at a speed of 2.55 multiply.gif 105 m/s. What is the frequency of the beacon observed on the spaceship
Calculate ultimate bod where discharge and river meet : Wastewater from a paper mill contains ultimate BOD of 200ppm and DO of 3ppm, water is discharged at a rate of 100,000 gallons per day into a river, the river has a flow of 1 million gallons per day with no BOD

Reviews

Write a Review

Civil Engineering Questions & Answers

  How to design the curve of the roadway at station

An equal tangent vertical curve is to be constructed between grades of -3.0% (initial) and 1.0% (final). The PVI is at station 110+00 and elevation 420 ft. Due to a street crossing the roadway, the elevation of the roadway at station 112+00 must b..

  What should be the surface area of the lagoon

If the evaporation rate from an open water surface is 0.27 inch/day in Tucson Arizona, what should be the surface area of the lagoon? (Note: arsenic does not evaporate but remains in the liquid water)

  Establish a horizontal distance

a tape is calibrated and found to measure 100.04ft between the 0- and 100-ft marks. what measurements should be laid out to establish a horizontal distance of 682.25ft?

  Find out the number of turns in each spring

Find out the number of turns in each spring, if the diameter of the spring wire 14 mm and the diameter of coil is 80 mm. Assume C=84 GN/mmxmm.

  Determine stations and elevations of pvts of curves

determine the stations and elevations of the PVCs, PVIs and PVTs of the two vertical curves required to connect the highway segments, as well as the length of the constant grade section (connecting grade is to be small as possible).

  Shear and bending moment expressions

Show or formulate the shear and bending moment expressions for each board, and plot/draw the shear and bending moment diagrams of the boards.

  Determine what constricted width would be to force the flow

Given that uniform flow is subcritcal and there is a constriction in a rectangular channel, how do you determine what the constricted width would be to force the flow to be critical. Draw this transition on a specific energy curve.

  What is force of water on spillway whose upstream is given

What is the force of the water on a spillway whose upstream depth is 1.2m and whose downstream depth is 0.2m. The width of the spillway is 3m.

  Determine what is the final concentration of cfu-l

A hypothetical water treatment train consisting of coagulation/flocculation unit, filtration unit and chlorination system is used to treat surface water characterized by bacterial concentration of 800,000 CFU/L.

  Calculate the uniform flow depth in the channel at flow rate

Water flows i a 8-m-wide rectangular channel that has longitudinal slope of .0001. The channel has an equivalent sand roughness of 2mm. Calculate the uniform flow depth in the channel when the flow rate is 15m^3/s. Use the Darcey-Weisbach equation..

  What is the probability that the second explosion

Cities cover approximately 0.5% of the Earth's land area, which itself constitutes 29% of the total surface of the planet. What is the probability that the second explosion in part (b) occurs over a city? Assume an equally likely probability of im..

  Write a balanced net equation for the reaction

Write a balanced net equation for the reaction of the hydrogen ascorbate anion with water where hydrogen ascorbate acts as an acid.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd