Application problem to a conwip production strategy

Assignment Help Management Theories
Reference no: EM131072471

Convert the assembly line presented in the chapter 7 application problem to a CONWIP production strategy. The assembly line was described as follows:

A new serial system consists of three workstations in the following sequence: mill, deburr, and wash. There are buffers between the mill and the deburr stations and between the deburr and the wash stations. It is assumed that sufficient storage exists preceding the mill station. In addition, the wash station jams frequently and must be fixed. The line will serve two part types. The production requirements change from week to week. The data below reflect a typical week with all times in minutes.

Arrivals represent demands for completed products. Demands are satisfied from finished goods inventory. Each demand creates a new order for the production of a product of the same type after it is satisfied. The completed product is place in the finished goods inventory.

Three quantities must be determined through simulation experimentation:

1. The CONWIP level, that is the maximum number of parts allowed on the line concurrently.

2. The target FGI level for part type 1.

3. The target FGI level for part type 2.

Two approaches to setting these values could be taken. Choose either one you wish.

1. Approach one.

a. Set the FGI inventory level for each product as described in this chapter. Set the CONWIP level to infinite (a very high number). Use an infinite (again a very high number) FGI inventory level to determine the minimum number of units needed for a 100% service level.

b. Determine the inventory level needed for a 99% service level during the average replacement time analytically. The average replacement time is the same for each part type. Determine the average lead time using the VUT equation for each station. Sum the results. Remember that ca at a following station is equal to cd at the preceding station. Hints: 1) The VUT equation assumes that there is only one part type processed at a station. Thus, the processing time to use a the mill station is the weighted average processing time for the two part types. The weight is the percent of the total parts processed that each part type is of the total: 60% part type 1 and 40% part type 2. The formulas for the average and the variance for this situation are given in the discussion of discrete distributions in chapter 3. 2) The formula for the variance of a uniform distribution is given in chapter 3. 3) Ignore the downtime at the was station for this analysis.

c. Assess the service level for the inventory level midway between the lower and upper bound.

d. Pick the lowest level of inventory of three that you have tested that yields close to a 99% service level. Note average and maximum WIP on the serial line for this value.

e. Set the CONWIP level to the lowest value that doesn't negatively impact the service level. The minimum feasible CONWIP level is 3. Try values of 3, 4, 5, ... until one is found that does not impact the service level. Confirm your choice with a paired-t analysis.

f. Compare the maximum WIP before the CONWIP level was establish to the CONWIP level you selected.

2. Approach two:

a. Find the minimum CONWIP level that maximizes throughput. Set the two FGI levels to infinite (a very high number) so that the service level is 100%. The minimum feasible CONWIP level is 3. Try values of 3, 4, 5, ... until one is found such that the throughput is no longer increasing. Confirm your choice with a paired-t analysis.

b. Compare the maximum WIP in the serial line without the CONWIP control to the CONWIP level you select. The former could be determined by setting the CONWIP level to a large number.

c. Estimate the finished goods inventory level need to satisfy customer demands using the approach described in this chapter and after the CONWIP level has been established. Use an infinite (again a very high number) FGI inventory level to determine the minimum number of units needed for a 100% service level

d. Determine the inventory level needed for a 99% service level during the average replacement time analytically. The average replacement time is the same for each part type: the average lead time at station j is given by the following equation discussed in Chapter 9 where M = 3 stations and N is the CONWIP level you selected:

e. Assess the service level for the inventory level midway between the lower and upper bound and pick the lowest level that yields close to a 99% service level.

Terminating Experiment:     

Use a simulation time interval of 184 hours.

Application Problem Issues

1. How should the CONWIP control be modeled?

2. What should the ratio of the two FGI levels be if prior information is used?

3. Should the mean or maximum WIP level on the serial line with no CONWIP control be compared to the CONWIP level?

4. Given the CONWIP control, is it necessary to model the finite buffer space between the stations on the serial line? Why or why not?

5. How will verification and validation evidence be obtained?

Reference no: EM131072471

Questions Cloud

Can you guess what the form of the lmc curve is : Can you guess what the form of the LMC curve is?
What unadjusted interest rate will apply : The equity index used with Joe's indexed annuity stood at 1000 when his funds were allocated to the index strategy and 1200 at the conclusion of the index term period. Using the long-term point-to-point interest rate method, what unadjusted interest ..
Compute the marginal cost in the fourth column of your table : Plot the MC curve on the same graph as the ATC curve, and verify that it cuts the ATC at its minimum point.
What are the money market yield-bond equivalent yield : A $200,000 face value, 182-day Treasury Bill is currently selling at a quoted discount of 5.9%. What are the dollar discount AND purchase price? A $200,000 face value, 182-day Treasury Bill is currently selling at a quoted discount of 5.9%. What are ..
Application problem to a conwip production strategy : Convert the assembly line presented in the chapter 7 application problem to a CONWIP production strategy. The assembly line was described as follows:
Check that these lmc curves intersect with the lac curves : Check that these LMC curves intersect with the LAC curves appropriately.
What effect would you expect this new leverage policy : This year Andrews achieved an ROE of 6.2%. Suppose the Board of Directors of Andrews mandates that management take measures to increase financial Leverage (=Assets/Equity) next year. Assuming Sales, Profits, and Assets remain the same next year, what..
Explain the purpose and advantages of promotion : In simple terms, promotion refers to upward movement in present job loading to greater responsibilities, higher status and better salary. With regard to this, explain the purpose and advantages of promotion.
Cost of debt-cost of equity and basic earning power : Iddle Publishing currently is financed with 10% debt and 90% equity. However, Biddle's CFO has proposed that the firm issue new long-term debt and repurchase some of the firm’s common stock. Cost of debt, Cost of equity, basic earning power, net inco..

Reviews

Write a Review

Management Theories Questions & Answers

  Talent-related risks on your business and future capabilitie

How can you determine the impact of specific talent-related risks on your business and future capabilities?

  Advantages of each decision that elaine has made

Discuss the advantages and disadvantages of each decision that Elaine has made

  Myers-briggs type indicator

Typology Test and take a print out of the resulting type. Read your type description and submit a critique of the test, not just a summary of the results.

  Performance measurement guide for information security

•Review NIST SP 800-55 Rev. 1, Performance Measurement Guide for Information Security.•Discuss measures you would be interested in finding the results, based on your home computing systems and/or network.

  Being a manager describe the general elements

1. Being a manager describe the general elements you will consider while making outsourcing decisions.? 2. Being a virtual manager describe the benefits and challenges associated with managing a global team.?

  Reflection paper to safeassign via the class blackboard site

Reflection paper to SafeAssign via the class Blackboard site.

  What would you do the same

What would you do the same?

  Please assign to jeremy slick

Please assign to Jeremy Slick.

  If you were the supervisor in charge - what would you do

What can you change about the way the work is done to deal with the unavoidable physical fatigue - If you were the supervisor in charge, what would you do?

  Think about an organization

Think about an organization that you are familiar with. How can activity-based costing (ABC) be used in that organization to help it achieve its objectives?

  Review the case for critical analysis empress luxury

review the case for critical analysis empress luxury lines1.analyze the ethical dilemma faced by antonio2.create and

  What are some of the components of these cultures

What are some of the components of these cultures that you need to understand from a business standpoint?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd