A project can be closed for several reasons.

Assignment Help Project Management
Reference no: EM13319404 , Length: 500 WORDS

word count is between 500-700

in-text citation should be included as well as Harvard Style referencing.

In working out your responses to the Discussion Question, you should choose examples from your own experience or find appropriate cases on the Web that you can discuss. Credit will be given for references that you make to relevant examples from real companies.Please make sure that you cite and reference all of your outside sources properly, as per the Harvard Referencing System.

 

QUESTION

A project can be closed for several reasons. One reason is that the project has met its objectives; another reason could be that the project either failed to meet its objectives or is expected to fail. A third reason for closing a project could be that it is no longer aligned with corporate strategy. Analyse and discuss the differences between closing a project that has met its objectives and closing one that was terminated early. Look at both administrative closure and associated contract closure. Give reasons for stating the differences between the two scenarios.

 

 

Reference no: EM13319404

Questions Cloud

How long does it take the plane to fly over the river : An airplane, capable of flying at a speed of 500 miles/hr in still air (i.e., the airplane can fly with a speed of 500 miles/he relative to the air), How long does it take the plane to fly over the river
Specify changes required to satisfy the aisc specification : The column bearing is 12 in. measured along the beam, and the bearing plates at the end supports are each 8 in. Investigate this beam of A992 steel for (a) flexure, (b) shear, and (c) satisfactory transmission of the reactions load
Did economic well-being rise more in 2002 or 2003 : Compute the percentage change in nominal GDP, real GDP, and the GDP deflator in 2002 and 2003 from the preceding year. For each year, identify the variable that does not change. Explain in words why your answer makes sense.
A project can be closed for several reasons. : A project can be closed for several reasons.
A project can be closed for several reasons. : A project can be closed for several reasons.
Define and classify which reaction is single replacement : Classify which reaction is single replacement, double replacement, decomposition, combination and combustion. SiO2+HF--->sIf+H2O C7H10N+O2--->CO2+H2O+NO2 KO2+CO2--->K2CO3+O2 C4H10+Cl2+O2--->CO2+CCl4+H2O Ca3p2+hH2O--->Ca(OH)2+PH3
What is the wavelength in front of the police car : A police car is traveling east at 39.5 m/s along a straight road, overtaking a car ahead of it moving east at 32.0 m/s. What is the wavelength in front of the police car
Determine the design speed of the curve with the pvc : An egual-tangent sag vertical curve is designed with the PVC at station 109+00 and elevation 950 ft, the PVI at station 110+77 and elevation 947.34 ft, and the low point at station 110+50.
What will be the new equilibrium price and quantity : Your college plans to increase total enrollment next year by 5,000 students. The additional students will have the following demand schedule: [Refer the attachment, table2] Now add the old demand schedule and the demand schedule for the new students ..

Reviews

Write a Review

Project Management Questions & Answers

  How many orders will boboux usa need to place to the parent

How many orders will Boboux Usa need to place to the parent company in New Zealand? Borboux USA sells New Zealand hand made leather balloons to American Customers. For one of their more popular lines, the manager estimates that

  Construct a flyover in the city to ease traffic congestion

The project manager on a project to construct a flyover in the city to ease traffic congestion. Flyover construction should cause minimum disruption to the traffic until it is complete. Ensuring safety of the commuters and workers at the site is the ..

  State one strategy you think jetblue should adopt

Based on what you have learned in this course, state one strategy you think JetBlue should adopt over the next three years

  Developing the work flow sequence

Develop the work flow sequence specified in the problem shown below. Do not consider any of the scheduling information provided below in your work.

  Proper operation strategy changes for companies

Why does the "proper" operation strategy keep changing for companies that are world-class competitors?

  Constructing a decision tree to make best decision

Current factories cannot produce these new products. Construct a decision tree to help Expando make the best decision.

  Explaining use of wbs in a project

How and why you would use a WBS in a project? No particular project, just got stuck on this part of the assignment and needed some input.

  Use of multicultural and intercultural communication

How can you use multicultural communication, intercultural communication and intracultural communication in your life

  New learning in the field of project management.

Demonstrate understanding of new learning in the field of project management.

  Explaining timeline of key trial events

Did your subject appeal? If so, on what grounds did he/she base the appeal? Provide a timeline of key trial events.

  Calculating scheduled completion time

Calculate the scheduled completion time and identify the critical path.

  Difference between a task flow network diagram

Explain what is the difference between a task flow network diagram and a Gantt chart. What is the relative value of each to the project manager?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd