1 introductionthe groundwater level has risen and now is

Assignment Help Civil Engineering
Reference no: EM13351150

1. Introduction

The groundwater level has risen and now is present in the cut. Answer the following questions. Show allwork.

1 b. Evaluate the pressure head at point a

529_Evaluate the pressure head at point.png

hpa = equation

hpa =

hpa =

2 b. Evaluate the pressure head at point b

hpb = equation

hpb =

hpb =

2 c. Determine the vertical effective stress at point b?

Σvb =

2 d. The factor of safety in the slope for the given groundwater conditions is?

less than 1 1.2

2 e. The ground behavior is classified as stable firm sandy flowing/piping

3. Introduction

Given the following gravity retaining wall design. The wall foundation is on sand. Answer the subsequent questions. Show allwork.

3 a. Evaluate the lateral pressurein the brown clay: ph clay

Ph clay = equation

3 b. Height of clay behind wall:_____ ft-5- ce 4434 project iii name:________________
due: 19 december 2013 open book/open note critical: show all work work alone: neat and professional

3 c. Slope inclination behind wall:_____ o

4. Active earth pressure coefficient

4 a. Horizontal component (kh): _________________

4 b. Source___figure 17-29___

919_Evaluate the pressure head at point1.png

5. Determine lateral earth pressure in brown clay

ph clay =

ph clay =

Reference no: EM13351150

Questions Cloud

- write your own transformational story your : - write your own transformational story. your transformational experience can be about adversity but it does not
Analyze case study - the cliptomania web storeshow the : analyze case study - the cliptomania web storeshow the strategic issues faced by the company in launching and
Problem 1 modify the state diagram branching conditions in : problem 1. modify the state diagram branching conditions in the diagrams below as needed to ensure the sum and
From the it distribution point of view how do you believe : from the it distribution point of view how do you believe that information sharing could lead to a reduction of lead
1 introductionthe groundwater level has risen and now is : 1. introductionthe groundwater level has risen and now is present in the cut. answer the following questions. show
Address the following scenario providing two distinct : address the following scenario providing two distinct options and arguing the benefits and costs of each. you are the
You are the secretary for a large church you have a : you are the secretary for a large church. you have a database with over 5000 names addresses and telephone numbers.a
Supporting mobile health clinics the childrens health fund : supporting mobile health clinics the childrens health fund of new york city. see case study below.bull examine the case
Part-1you have spent a lot of time developing your : part-1you have spent a lot of time developing your application and released it to the field. now you are starting to

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the new water content

A soil sample with a water content of 14.5% and unit weight of 128.2 lb/cu. ft. was dried to a unit weight of 118.8 lb/cu. ft. without changing its void ratio. What is its new water content (in %)?

  Determine the magnitude of the smallest velocity reached

The motion of a particle is defined as x=t^2-8t+7 and y=0.5t^2+2t+4, where x and y are in meters and t is in seconds. Determine the magnitude of the smallest velocity reached by the particle, and the time, position, and direction of that velocity.

  What is the conversion rate for parts per million by volume

What is the conversion rate for parts per million by volume (ppmv)conversion. How is this converted into atm, Pa, and torr

  Calculate strains for case where coordinate axes are rotated

An element of material subjected to a plane strain has a strain epsilon x of 280x10^-6, a strain epsilon y of 420x10^-6 and an engineering shear strain gamma xy of 150x10^-6.

  Find the final speed

Two carts with masses of 4.72 kg and 2.84 kg move toward each other on a frictionless track with speeds of 4.86 m/s and 3.97 m/s respectively. The carts stick together after colliding head-on. Find the final speed.

  Find the probability that the drawn marble is blue or red

A marble is drawn at random from a box containing 10 red, 30 white, 20 blue, and 15 orange marbles. Find the probability that is: (a) orange or red (b) not red or blue (c) not blue (d) white (e) red, white, or blue

  Calculate the torque and torsional shearing at the wall

a 31' solid circular bar of 2" diameter is fixed to a wall. it is made of aluminum of E=10*10^6. a 30" circular solid 1" diameter aluminum bar is welded to the 2" bar at a 30" centerline perpendicular relative to the other bar per the diagram.

  Find what is the future worth at 15 years of the investment

general price inflation is estimated to be 3% for the next 5 years, 5% the 5 years after that, and 8% the following five years. If you invest $10,000 at the market rate of 10% for those 15 years,

  Derive the 3-h snyder unit hydrograph for a 100-square km

Derive the 3-h Snyder unit hydrograph for a 100-km^2 watershed where the main stream is 15 km long and the distance from the watershed outlet to the point on the stream nearest to the centroid of the watershed is 7 km.

  How many metric tons per day of nox are emitted

A coal-fired power plant produces a net electrical output of 500 MW. The composition of the coal burned is C= 72 %, H= 6 %, S= 3.5 %, O= 6 %, N= 1 %, and ash= 12 % by weight. It's heating value (HV) is 30200 kJ/kg. The net thermal efficiency is 36..

  Determine the maximum external pull by the tractor

Determine the maximum rimpull of the tractor in each of the indicated gears if the efficiency is 92%. If the tractor is operated over a haul road whose slope is +2.5% with rolling resistance of 80 lb/ton

  Determine flow rate of water from nozzle through pipe

4 in diameter pipeline 200ft long discharges water from nozzle with 2 in diameter jet at an elevation which is 100ft below the water level of supply reservoir. find flow rate through pipe

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd