Write definition of afflux and skew bridge, Civil Engineering

Assignment Help:

Write definition of the following -

(i) Afflux. ( ii ) Free Board. ( iii ) Clearance. ( iv ) Via duct. ( v ) Skew Bridge ( vi ) Cause Way. ( vii ) Clear Span. ( viii ) Effective span. ( ix ) Over all Span ( x ) Score. ( xi ) Water Way.

Ans.- Afflux - It is the rise in the flood level of the river up stream of the bridge as a result of obstruction to natural flow caused by the construction of the bridge.

Free Board - This is the vertical distance between the high flood level inclusive of afflux and the formation level.

Clearance - This is the vertical distance between the high flood level inclusive of afflux and the bottom most part of bridge super structure like slab girder etc.

Via duct - When the bridge is constructed to cross a valley for railway instead of filling it the bridge as called via duct.

Skew Bridge - When the bridge is not right angle to the axis of river or other such opening it is called a skew bridge.

Cause Way - It is a bridge constructed to pass a flood water over the railway track is called cause way.

Clear Span - It is the clear distance between any two bridge supports like abutments piers etc. Effective span - It is the distance between centers of two adjacent bridge supports.

Over all Span - It is the over all length of girder.

Score - It is the rise in the distance from rail level and bottom of rivers.

Water Way - The area of the opening of a bridge blow super structure through which water flows is called water way.


Related Discussions:- Write definition of afflux and skew bridge

Beams, how to convert uniformly varying loads to point loads

how to convert uniformly varying loads to point loads

Mini projcts in diaster management.., any new innovative metods to protct b...

any new innovative metods to protct building from disater

Binomial distribution - exact probability, Binomial Distribution - exact pr...

Binomial Distribution - exact probability: For the binomial distribution having n = 10, y = 0.4, find p (X ≤ 4) using equations and verify that equation gives a better approxi

State the term - failure due to strain, State the term - Failure Due to Str...

State the term - Failure Due to Strain In most of  the cases of pre-stressed concrete construction, the failure of underreinforced and lightly reinforced members shall take pla

How do we calculate absolute pressure, Absolute is equivalent to gauge pres...

Absolute is equivalent to gauge pressure plus atmospheric.

Engineering project control, need help with my assignment. An Asian Pacific...

need help with my assignment. An Asian Pacific capital city proposes to design, construct and operate a new double track railway from the city to connect to its major airport. Pref

State the procedure of prestressing, State the procedure of prestressing ...

State the procedure of prestressing When these wires cool down, concrete is poured in the moulds in which these tendons are provided in a stretched condition. Using this proces

Determine the dimension of the vertical side walls, Determine the dimension...

Determine the dimension of the vertical side walls for a rectangular open channel designed to convey 150 cfs of storm water runoff. The runoff is collected in the parking lots and

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd