Write definition of afflux and skew bridge, Civil Engineering

Assignment Help:

Write definition of the following -

(i) Afflux. ( ii ) Free Board. ( iii ) Clearance. ( iv ) Via duct. ( v ) Skew Bridge ( vi ) Cause Way. ( vii ) Clear Span. ( viii ) Effective span. ( ix ) Over all Span ( x ) Score. ( xi ) Water Way.

Ans.- Afflux - It is the rise in the flood level of the river up stream of the bridge as a result of obstruction to natural flow caused by the construction of the bridge.

Free Board - This is the vertical distance between the high flood level inclusive of afflux and the formation level.

Clearance - This is the vertical distance between the high flood level inclusive of afflux and the bottom most part of bridge super structure like slab girder etc.

Via duct - When the bridge is constructed to cross a valley for railway instead of filling it the bridge as called via duct.

Skew Bridge - When the bridge is not right angle to the axis of river or other such opening it is called a skew bridge.

Cause Way - It is a bridge constructed to pass a flood water over the railway track is called cause way.

Clear Span - It is the clear distance between any two bridge supports like abutments piers etc. Effective span - It is the distance between centers of two adjacent bridge supports.

Over all Span - It is the over all length of girder.

Score - It is the rise in the distance from rail level and bottom of rivers.

Water Way - The area of the opening of a bridge blow super structure through which water flows is called water way.


Related Discussions:- Write definition of afflux and skew bridge

Trusses design, does the truss pitch relate to the building''s height?

does the truss pitch relate to the building''s height?

Explain forty-five degree spread rule for driven piles, Q. Explain Forty-fi...

Q. Explain Forty-five degree spread rule for driven piles ? For driven piles the length of piles driven into the ground is generally based on dynamic driving formula such as Hi

Engg surveying, what does mean by too short and too long in erroneous tape ...

what does mean by too short and too long in erroneous tape length?

Riveted and welded joints, Riveted and Welded Joints: This theory deal...

Riveted and Welded Joints: This theory deals with riveted and welded connections. In riveted connections, you have learnt different types of rivet and various parameters perta

Discuss about the fibre reinforced concrete, Discuss about the fibre reinfo...

Discuss about the fibre reinforced concrete Tensile strength of concrete may be improved by using a higher grade of concrete or by using special concretes such as fibre reinfor

Determine the term - lowering of stresses, Determine the term -  lowering ...

Determine the term -  lowering of stresses Due to creep of concrete, these compressive strains keep on increasing with time. it means that the length of the member keeps on red

Computation of settlement, Q. Computation of Settlement? The settlement...

Q. Computation of Settlement? The settlement  in any soil mass under an applied stress is given by s = s i + s c + s s where, S  =  total settlement, S i =  imm

Define mechanical tool for underwater inspection of bridge, Define Mechanic...

Define Mechanical tool for underwater inspection of bridge? Mechanical devices that involves a Schmidt Test Hammer for computing concrete surface hardness, and rotary coring eq

I have a take home quiz, Hello I have a take home final needs be ordered, d...

Hello I have a take home final needs be ordered, do you have very well skilled professionals to make it?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd