Write definition of afflux and skew bridge, Civil Engineering

Assignment Help:

Write definition of the following -

(i) Afflux. ( ii ) Free Board. ( iii ) Clearance. ( iv ) Via duct. ( v ) Skew Bridge ( vi ) Cause Way. ( vii ) Clear Span. ( viii ) Effective span. ( ix ) Over all Span ( x ) Score. ( xi ) Water Way.

Ans.- Afflux - It is the rise in the flood level of the river up stream of the bridge as a result of obstruction to natural flow caused by the construction of the bridge.

Free Board - This is the vertical distance between the high flood level inclusive of afflux and the formation level.

Clearance - This is the vertical distance between the high flood level inclusive of afflux and the bottom most part of bridge super structure like slab girder etc.

Via duct - When the bridge is constructed to cross a valley for railway instead of filling it the bridge as called via duct.

Skew Bridge - When the bridge is not right angle to the axis of river or other such opening it is called a skew bridge.

Cause Way - It is a bridge constructed to pass a flood water over the railway track is called cause way.

Clear Span - It is the clear distance between any two bridge supports like abutments piers etc. Effective span - It is the distance between centers of two adjacent bridge supports.

Over all Span - It is the over all length of girder.

Score - It is the rise in the distance from rail level and bottom of rivers.

Water Way - The area of the opening of a bridge blow super structure through which water flows is called water way.


Related Discussions:- Write definition of afflux and skew bridge

Truss, Wind Force acting on truss

Wind Force acting on truss

Define hydraulic tools for underwater inspection of bridge, Define Hydrauli...

Define Hydraulic tools for underwater inspection of bridge? Hydraulic tools involve grinders, rotary brushes and scrubbers. The benefits of hydraulic tools are the same as thos

What is long welded rail, Q. What is Long Welded Rail? Long Welded Rail...

Q. What is Long Welded Rail? Long Welded Rail is a welded rail the central part of which dose not under go any longitudinal movement due to temperature variation, normally a le

Design nominal reinforcement for staircase, Question Given a 1meter hig...

Question Given a 1meter high staircase resting on solid concrete, could it be adequate to design nominal reinforcement for staircase? Answer For design of staircase,

survey, what is fore bearing and back bearin

what is fore bearing and back bearing

Calculate the principal stresses for the state of stress, Calculate the pri...

Calculate the principal stresses for the state of stress: Calculate the principal stresses and principal planes for the state of stress shown in Figure. Figure

Reduced levelling, what is the theary of reduced levelling

what is the theary of reduced levelling

Surveying, with a neat well labelled sketch, explain reciprocal ranging.

with a neat well labelled sketch, explain reciprocal ranging.

AERATED CONCRETE, AIR ENTRAINING AGENT USED IN CONCRETE OTHER THAN ALUMINIU...

AIR ENTRAINING AGENT USED IN CONCRETE OTHER THAN ALUMINIUM POWDER

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd