Write definition of afflux and skew bridge, Civil Engineering

Assignment Help:

Write definition of the following -

(i) Afflux. ( ii ) Free Board. ( iii ) Clearance. ( iv ) Via duct. ( v ) Skew Bridge ( vi ) Cause Way. ( vii ) Clear Span. ( viii ) Effective span. ( ix ) Over all Span ( x ) Score. ( xi ) Water Way.

Ans.- Afflux - It is the rise in the flood level of the river up stream of the bridge as a result of obstruction to natural flow caused by the construction of the bridge.

Free Board - This is the vertical distance between the high flood level inclusive of afflux and the formation level.

Clearance - This is the vertical distance between the high flood level inclusive of afflux and the bottom most part of bridge super structure like slab girder etc.

Via duct - When the bridge is constructed to cross a valley for railway instead of filling it the bridge as called via duct.

Skew Bridge - When the bridge is not right angle to the axis of river or other such opening it is called a skew bridge.

Cause Way - It is a bridge constructed to pass a flood water over the railway track is called cause way.

Clear Span - It is the clear distance between any two bridge supports like abutments piers etc. Effective span - It is the distance between centers of two adjacent bridge supports.

Over all Span - It is the over all length of girder.

Score - It is the rise in the distance from rail level and bottom of rivers.

Water Way - The area of the opening of a bridge blow super structure through which water flows is called water way.


Related Discussions:- Write definition of afflux and skew bridge

Designing of pipe jacking, Question While designing of pipe jacking , ...

Question While designing of pipe jacking , what particular areas on pipe joints have to engineers make sure of? Answer While in pipe jacking, jacked pipes may well ha

Baur leonhardt system, What is the special feature of this system rather th...

What is the special feature of this system rather than other?? What do you mean by principal of looping system?

Designing of corbel beams in a pump station, Question In designing of ...

Question In designing of corbel beams in a pump station , why are shear links designed in top 2/3 of section? What is general advice on designing? Answer Corbel

Differences between pipe jacking and micro-tunnelling, Q. Differences betwe...

Q. Differences between pipe jacking and micro-tunnelling? Pipe jacking is a general scheme of installation of pipes with a tunnelling shield in front and the pipes are jacked f

Survey chain, describe gunters chain in survey

describe gunters chain in survey

Delay of bituminous laying on top of sub-base, Question In case if ther...

Question In case if there is a delay of bituminous laying on top of sub-base, have to tack coat be applied on the top surface of sub-base? Answer When there is a d

Sub-base layer be served as a drainage layer , Question Would a sub-bas...

Question Would a sub-base layer be served as a drainage layer to take away water from pavement? Answer As well providing load distribution in post-construction stage a

Define air chamber and surge tank, Q. Air chamber vs. surge tank in pressur...

Q. Air chamber vs. surge tank in pressurized pipelines? Air chambers and surge tanks are generally installed in water main to ease the stress on the system when valves or pumps

Survey, Operations invending in chain survey ...

Operations invending in chain survey .....

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd