Write a short note on economic span of a bridge, Civil Engineering

Assignment Help:

Q. Write a short note on Economic Span of a Bridge?

The span for which the total cost of bridge will be minimum is known as the economic span.

The ratio of Cost of super structure and Cost of Sub structure = 1

Economical Span = √P / a  , 

Where -    a = p / l2 ,  p = Cost of pier ( Super structure ) ,   l = Span, 

                 P = Cost of Pier ( Sub Structure ) ,     a = Constant of variation.


Related Discussions:- Write a short note on economic span of a bridge

Explain about vierendeel girder, Q. Explain about Vierendeel girder? Vi...

Q. Explain about Vierendeel girder? Vierendeel girder design is sometimes adopted in design of footbridges. Traditionally truss design, triangular shape of truss is generally u

Define the term - permanent load, Define the term - permanent load Wher...

Define the term - permanent load Where the permanent load is less than or equal to 25% of the design imposed load, deflections may be calculated using any elastic method. When

Determine the governing effective length of a steel column, Determine the g...

Determine the governing effective length of a steel column? Determine the governing effective length of a W12 x 106 steel column that is 12' high, pinned at each end, and

On-line storage vs. off-line storage, On-line storage vs. off-line storage ...

On-line storage vs. off-line storage Design of storage pond is commonly divided into off -line storage and on-line storage. The on-line storage concept includes inclusion of s

Uses of lime, Uses of Lime Uses of lime in civil works are following : ...

Uses of Lime Uses of lime in civil works are following : For making mortar  for masonry works and plastering For white washing. For soil stabilization. To produc

Explain flocculation, Explain Flocculation Most important factor ef...

Explain Flocculation Most important factor effecting particle removal efficiency objective - to bring particles into contact so that they will collide, stick together

Jacking face for pipe-jacking, Ground settlement occurs ahead or behind the...

Ground settlement occurs ahead or behind the jacking face for pipe-jacking? It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 ti

Tests on stones, Tests on Stones To ascertain the needed properties of ...

Tests on Stones To ascertain the needed properties of stones, described tests can be conducted: A.   Crushing strength test B.   Water absorption test C.   Abrasion te

Coagulation, Incoming water contains 2.5 mg/L as a substance of natural alk...

Incoming water contains 2.5 mg/L as a substance of natural alkalinity (HCO3-). The flow rate is 9.5 ML/day). (a) What feed rate is required if the alum dose is 7 mg/L and is avail

Design storm water drains to match soffit, Question Why is it best to desig...

Question Why is it best to design storm water drains to match soffit? Answer Storm water drains gather storm water in their corresponding catchment areas throughout rainst

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd