Structural drawing, Civil Engineering

Overview  

A structure is required to support a conveyor and various ancillary equipment, between two buildings in an industrial area. It is 12m long and made up of structural steel as shown in the accompanying sketches, in the figure below.

You are required to:

Draw, using combined scales 1:20 for Elevation, Plan & Section and 1:10 for details, the following views so that the supporting structure can be fabricated

a) Elevation.

b) Plan

c) Section.

d) NOTE : Students are also to draw any additional details or views that is not covered by views 1 to 3.  

1. All bolts are 12 mm diameter HT steel; bolt holes are 14mm.diameter; minimum end cover to bolts is: Oblique cut 50; square cut 40; bolt centres are 50 minimum. The numbers of bolts required at connections and joints are as shown in the sketches.

2. H.D. bolts at supports are to be 20 mm diameter in 22 mm diameter holes, at "D" end, at 'C' end bolts are to be in slots 22 mm x 40 mm. In both cases bolts are to extend through flanges of lintel and channels.

3. At supports gusset plates for transoms are required at upper flanges only. 

4. At supports the design of gusset plate for bracing is to be such that it does not foul the expansion joint nor packing pieces.

Posted Date: 2/22/2013 1:25:54 AM | Location : United States







Related Discussions:- Structural drawing, Assignment Help, Ask Question on Structural drawing, Get Answer, Expert's Help, Structural drawing Discussions

Write discussion on Structural drawing
Your posts are moderated
Related Questions
Explain the Wetted Perimeter (P) The linear length of the interface between the fluid's cross-sectional plane edges in contact with the pipe or channel wall.


what are the characteristics of the beam to column connection?

A footing, 2 m square, is founded at a depth of 1.5 m in a sand deposit, for which the corrected value of N is 27. The water table is at a depth of 2 m from the surface. Verify the

Q. Write short notes on Aqua Privy Latrine? There are a sort of latrines also called septic tank latrines. These are constructed over septic tanks & flushing is also provided.

am currently doing my masters degree in highway,please suggest for me topics i will research on

Calculate the Number of Paths, Number of Critical Paths and Project Duration For the project network shown, the total number of paths through the network; number of critical pa

Each physical homogeneous type (solid, liquid orvapour) is a phase. Two or three phases may coexist.  e.g. Ice and water at 0 o C.  Mixtures of gases (e.g. Air) can only be

what are the different type of stones?

applications of distomat in briefly