Soil Mechanics, Civil Engineering

Good evening. I have two homework projects from the Soil Mechanics. I am interesting if anybody can solve them.
Posted Date: 12/3/2012 5:26:53 PM | Location : United States







Related Discussions:- Soil Mechanics, Assignment Help, Ask Question on Soil Mechanics, Get Answer, Expert's Help, Soil Mechanics Discussions

Write discussion on Soil Mechanics
Your posts are moderated
Related Questions
Define the Design of Piers and Abutments Erected in Water? All piers and abutments erected in water are generally designed to be protected from scour or erosion.  However, both

Question In General Specification for Civil Engineering Works, designing of roadbase material is based on recipe approach. Give reason. Answer Designing of roadbase

what is the allwoable combined aggregates Fineness Modulus

Different tape corrections

Q. Relation of pouring rate and temperature with concrete pressure on formwork Freshly placed concrete exerts pressure on formwork at the time of the placing operation. It's i

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

obstacles in chain surveying

ratio of moorum and aggregate

Q. Specification of Water bound macadam road? Formation - The embankment for road shall be made to the cross section shown on the drawing. The bank shall be raised in regular

Assessing Maintenance Needs: Maintenance needs can be assessed by a careful inspection of roads at regular intervals, observing defects such as : potholes cracks