Question
Is it necessary joints of concrete kerbs be in line with joints in concrete carriageway?
Answer In regular practice, joints are provided in road kerbs to cater for concrete expansion and contraction. Though, location of joints in kerbs is not arbitrary and they must match with joints in concrete carriageway. Or else, it is extremely likely that cracks might form in concrete kerbs at place of pavement joints.
pentavalent will be added impurity
Attached information shows construction details of a water tank. The slab was poured in one pour and the walls (incl. Baffles) were poured in two even sections. Forms were stripped
A saturated clay layer 4 m thick is located 6 m below GL. The void ratio of the clay is 1.0. When a raft foundation is located at 2 m below GL, the stresses at the top and bottom o
find the pressure head at 2-2 if the rate of flow in pipe is 0.36m^3/s
Q. Explain Strain compatibility in mini-piles? In designing the axial capacity of mini-piles, grout can be taken into account in the contribution of axial load capacity. Though
30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 28% swell and shrinkage of 18%. The final volume of the compacted so
hi contactme 9902142308
determine the maximum positive and negative shear shear
what type of ethics is environmentel ethics
Pavement of evaluation
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd