Is it necessary joints of concrete kerbs be in line with joints in concrete carriageway?


Answer

In regular practice, joints are provided in road kerbs to cater for concrete expansion and contraction. Though, location of joints in kerbs is not arbitrary and they must match with joints in concrete carriageway. Or else, it is extremely likely that cracks might form in concrete kerbs at place of pavement joints.


Related Discussions:- Joints in concrete carriageway

General requirement for civil engineering, Question General requirement for...

Question General requirement for Civil Engineering Works in 1992 Edition, Clause 15.09 details that tying wires for strengthening adjacent to and above Class F4 and F5 closes must

Contractor to continue concreting works, Question If on-site slump test fai...

Question If on-site slump test fails, is it necessary that engineers allow a contractor to continue concreting works ? Answer This is an extremely traditional question raised by

Derive, Derived condition of economic span of bridge

Derived condition of economic span of bridge

Higway engineering, Ask question Design the pavement by group index method ...

Ask question Design the pavement by group index method for heavy traffic using following subgrade data Soil passing 75micron sieve =65%,liquid limit =40%plastic limit =20% #Min

Distinguish among active and passive earth pressure, Distinguish among  'ac...

Distinguish among  'active' and 'passive' earth pressure. Describe clearly Rebhann's graphical construction method to evaluate the earth pressure on a retaining wall. What are t

Determine the final stresses in the bolt, Determine the final stresses in t...

Determine the final stresses in the bolt: A steel bolt of diameter 12 mm and length 175 mm is used to clamp a brass sleeve of length 150 mm to a rigid base plate as in Figure.

How are freeway bridges built, After measuring the anticipated traffic for ...

After measuring the anticipated traffic for the bridge, cement/reinforced- with- rebar stanchions are spaced over the freeway to accommodate the bridge. An 'off-ramp' from the free

Grade of cement, Grade of Cement: In India, the following grades of c...

Grade of Cement: In India, the following grades of cement are used for roads : Ordinary Portland Cement (OPC) Grade 33 Grade 43 Grade 53 Portland Pozz

Vertical curves - geometric design of roads, Vertical Curves: When tw...

Vertical Curves: When two vertical gradients meet, it is necessary to provide a vertical curve. Two types of vertical curves are used: (a) Summit curve, where the point of

Write short note on open foundation, Q. Write short note on Open Foundation...

Q. Write short note on Open Foundation? Broadly the foundation are classified into open i.e. shallow & deep foundations open as stated are shallow foundation where the soil str

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd