Q. Optimum binder content in bituminous pavement?
Amount of binder to be added to a bituminous mixture can't be too excessive or too little. Principle of designing the optimum amount of binder content is to comprise sufficient amount of binder so that aggregates are fully coated with bitumen and voids within the bituminous material are sealed up. The durability of bituminous pavement can be improved by the im-permeability achieved. Furthermore a minimum amount of binder is necessary to prevent the aggregates from being pulled out by abrasive actions of moving vehicles on the carriageway.
Though the binder content can't be too high since it would lead to the instability of the bituminous pavement. Basically, resistance to deformation of bituminous pavement under traffic load is decreased by the inclusion of excessive binder content.
how to measure a distance
method of raft foundation
Explain the Frame member's effective lengths 1. Effective length is a product of an effective length factor (k) and the actual length of the column. 2. k depends on th
chain survey prosses
fdsffds
Advantages of bonded post-tensioning systems Some advantages of bonded post-tensioning systems over unbonded post-tensioning ones are the following : (a) Large reduction in
what do you mean by harsh condrete mix or because of what concrete mix becomes harsh?
design a 3-meter cantilever slab to carry a uniform total dead load of 8.2KN/m^2 and a concentrated live load at the free end of 30 KN/m. f''c=28Mpa fy=420Mpa.
30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 28% swell and shrinkage of 18%. The final volume of the compacted so
On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft sub-g
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd