Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.

Posted Date: 2/1/2013 6:48:14 AM | Location : United States







Related Discussions:- Economic order quantity, Assignment Help, Ask Question on Economic order quantity, Get Answer, Expert's Help, Economic order quantity Discussions

Write discussion on Economic order quantity
Your posts are moderated
Related Questions
what is physics ?

Comparison of Disc and Drum type Brakes Drum Brake Disc Brake Drum brakes have cooling problem because the friction occurs at internal surfaces,

Advantage of flash butt welding 1. Higher weld strength 2. Higher production rate 3. Better heat concentration 4. Simple weld surface preparation 5. Wide range of m

diffrence between actual and idealactual vapour compression cycle

Multimeter: This is used to measure voltage, current and resistance of an electrical circuit (Figure). Figure: Multimeter

Abrasive Machining Processes Such machining processes are precision machining processes. They generate work-piece surfaces along with a high degree of surface smoothness and d

Isolated System: In an Isolated system, neither energy nor masses are permitted to cross the boundary. The system has constant mass and energy. No such system exists physicall


what are the properties magnet ? also how the repulsion is measured?

Over-Hanging and Cantilever Beam: Over-Hanging Beam: The beams on which one end or both ends are overhang are called as overhanging beam. 3. Cantilever Beam: