Economic Order Quantity:

Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stocking out P = 0.95, the standard deviation of demand during lead time σ L = 20 units, and Lead time L = 12 days. Discover the reorder point. Suppose that demand is over a 250 = workday year.

Solution

d' in above example is

 d = 500 /250 = 2   and lead time is 12 days.

 From the equation,

R = d'L + z σL  = 2 (12) + z (20)

Since, in this case z is 1.64. Substituting this value of z, we achieved

R = 2 (12) + 1.64 (20) = 24 + 32.8 = 56.8 units

This illustrated that when the stock on hand gets down to 56 units, order 100 more.

Posted Date: 2/1/2013 6:48:14 AM | Location : United States







Related Discussions:- Economic order quantity, Assignment Help, Ask Question on Economic order quantity, Get Answer, Expert's Help, Economic order quantity Discussions

Write discussion on Economic order quantity
Your posts are moderated
Related Questions
Draw the P-h and T-S diagram for the vapour compression cycle when the vapour after compression is : (i) wet region (ii) dry saturated

how an axial thrust is a generated in a helical gear

What is the difference between hot and cold working

Determine Maximum fibre stress: A beam of rectangular section of 80 mm to 120 mm carries a uniformly distributed load of 40 kN/m over a span of 2 m an axial compressive force


Design the bending moment and shear force diagram for a simply supported beam of length 9 m and carrying a Uniformly distributed load of 10 KN /m for a distance of 6 m from the lef

One can increase the toughness of a ceramic material by introducing fibers to the structure of the ceramic and create a ceramic-matrix composite. However, unlike other fiber-reinfo

LIMITATIONS OF GAS TUNGSTEN ARC WELDING (GTAW) It Produces lower deposition rates than consumable electrode arc welding processes. It Requires slightly more skill as comp

What is the objective of hydrostatic sensor paver machine To eliminate the problem in screw conveyer extension of hydrostatic sensor paver machine as per screed width" The p

WHAT IS DIFFERENCE BETWEEN POROSITY AND BLOW HOLE