Disparity between working stress and limit state approach, Civil Engineering

Assignment Help:

Question

What is key disparity between working stress approach and limit state approach?

Answer

Working stress approach, service loads are used in whole plan and strength of material is not utilized in full extent. In this means of plan, stresses acting on structural members are intended based on flexible way and they are designed not to beat certain acceptable values. In fact, whole structure during lifespan may only knowledge loading stresses far below ultimate state and that is reason why this means is known as working stress approach. In such scenario, most economical plan can hardly be obtained by using working stress advance that is now commonly used in design of temporary works.

For maximum state approach, for each material and load, a biased safety factor is assigned independently depending on material properties and load lands. So, each element of load and material properties is exactly assessed resulting in an extra refined and accurate analysis of structure. In this relation, material strength be capable of be utilized to its greatest value during its lifespan and loads be capable of be assessed with practical probability of occurrence. Boundary state approach is frequently used for majority of reinforced concrete design as it ensures utilization of material strength with least construction price input.

 


Related Discussions:- Disparity between working stress and limit state approach

Hybridisation, Why hybridisation never take in isolated atom

Why hybridisation never take in isolated atom

Explain the statements about construction contract process, Explain the Sta...

Explain the Statements about the Construction Contract Process I. Surety bond assures the project owner a guarantee of funds equivalent to a promissory note. The surety bond is

Why nautical mile is different from statute mile, One nautical mile is desc...

One nautical mile is described by one latitude minute of arc (there are 60 like minutes to a degree). This equals 1852 meters, and roughly (but coincidentally) 2000 yards or 6000 f

Assignment, do u do drawing assignment ( 3rd angle projection)

do u do drawing assignment ( 3rd angle projection)

Determine load carried by each cylinder, Determine load carried by each cyl...

Determine load carried by each cylinder: A hollow steel cylinder of cross-sectional area 2000 mm 2 concentrically surrounds a solid aluminium cylinder of cross-sectional area

Design of steel structure, in compression member [strut] why no deduction o...

in compression member [strut] why no deduction of area of rivet hole?

Necessity of pile tip cover for rock-socketed H-piles, Q. Necessity of pile...

Q. Necessity of pile tip cover for rock-socketed H-piles? In current practice concrete cover is generally provided at the pile tips of pre-bored H-piles socketed in rock. The o

Grillage foundation, what are the advantages of grillage foundation and why...

what are the advantages of grillage foundation and why people prefers that?

Describe the terms inside clearance and outside clearance, a) Explain with ...

a) Explain with a neat sketch how will you carry out the wash boring method of soil exploration. What are its merits and demerits? b) Describe the terms 'inside clearance' and '

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd