Determine the efficiency when the transformer, Electrical Engineering

Assignment Help:

A 3-kVA, 220:110-V, 60-Hz, single-phase transformer yields these test data:

• Open-circuit test: 200 V, 1.4 A, 50 W

• Short-circuit test: 4.5 V, 13.64 A, 30 W

Determine the efficiency when the transformer delivers a load of 2 kVA at 0.85 power factor lagging.


Related Discussions:- Determine the efficiency when the transformer

Explain shunt-field control process, Q. Explain Shunt-field control process...

Q. Explain Shunt-field control process? Shunt-field control, armature-resistance control offers a constant-torque drive because both flux and, to a first approximation, allowab

Draw and explain the r-2r ladder dac, Question 01 Convert the following bi...

Question 01 Convert the following binary numbers to its specified number system 111.101 (2) to octal 10111 (2) to decimal 0.1010 (2) to hexadecimal 1011.11 (2)

Explain common collector configuration, Q. Explain common collector configu...

Q. Explain common collector configuration? It is called the common-collector configuration because (ignoring the power supply battery) both the signal source and the load share

#signal processing, how to break a signal into time components

how to break a signal into time components

Find 2s complement of 8-bit no. by assembly language program, Write an asse...

Write an assembly language program to determine one's complement and two's complement of an 8-bit number. Ans One's complement of an 8-bit number LDA 2501H CMA STA

Microprocessors, Memory location 2000H has the word 5000H stored in it. Wha...

Memory location 2000H has the word 5000H stored in it. What does each location contain after DEC WORD PTR [2000H].

Equipment parameter data, Equipment parameter data: The schematic diag...

Equipment parameter data: The schematic diagrams for existing substations have to be prepared along with information of power transformer rating and numbers, impedance values,

What is own-exchange routing, Q. What is Own-exchange routing? Distribu...

Q. What is Own-exchange routing? Distributed routing or own-exchange routing enables alternative routes to be chosen at intermediate nodes. Hence the strategy is capable of res

Determine the speed at which the machine runs as a motor, A 100-kW, dc shun...

A 100-kW, dc shunt generator, connected to a 220-V main, is belt-driven at 300 r/min, when the belt suddenly breaks and the machine continues to run as a motor, taking 10 kW from t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd