Compute the primary current and the braking torque, Electrical Engineering

Assignment Help:

A three-phase, wye-connected, 400-V, four-pole, 60-Hz induction motor has primary leakage mpedance of 1 + j2  and secondary leakage mpedance referred to the primary at standstill of 1 + j2 . The magnetizing impedance is j40  and the core-loss impedance is 400 . Using the T-equivalent circuit of Figure 13.2.5(a):

(a) Calculate the input current and power (i) on the no-load test (S ∼ = 0) at rated voltage, and

(ii) on a blocked-rotor test (S = 1) at rated voltage.

(b) Corresponding to a slip of 0.05, compute the input current, torque, output power, and ef?ciency.

(c) Determine the starting torque and current; the maximum torque and the corresponding slip; and the maximum output power and the corresponding slip.

For the following parts, use the approximate equivalent circuit obtained by transferring the shunt core loss/magnetizing branch to the input terminals.

(d) Find the same values requested in part (b).

(e) When the machine is driven as an induction generator with a slip of -0.05, calculate the primary current, torque, mechanical power
input, and electric power output.

(f) Compute the primary current and the braking torque at the instant of plugging (i.e., reversal of the phase sequence) if the slip immedi-
ately before plugging is 0.05.


Related Discussions:- Compute the primary current and the braking torque

Evaluate currents in the circuits, Evaluate currents in the circuits: ...

Evaluate currents in the circuits: Determine currents I 1 and I 2 in the given circuits by applying KVL. Solution We apply KVL for first loop : 10 = 1 I 1   + 1 (

Find the thevenin equivalent of the circuit, (a) Find the Thevenin equivale...

(a) Find the Thevenin equivalent of the circuit shown in Figure (a) at the terminals A-B. (b) Determine the impedance that must be connected to the terminals A-B so that it is m

Superposition, find current across r3 with two voltage as sources

find current across r3 with two voltage as sources

Control signals - pins and signals , Control Signals There are two  con...

Control Signals There are two  control  signals and one  special  (ALE) in this  category. All these  signals  are output  signals. RD  (Read  signal ) it is  an active low

D/a converter, weighted resistor and r2r ladder d/a converter

weighted resistor and r2r ladder d/a converter

Schematic symbols, Schematic Symbols The junction gate field-effect t...

Schematic Symbols The junction gate field-effect transistor or JFET gate is sometimes drawn in the middle of the channel (in place of at the drain or source electrode as in t

Obtain the node voltages and current through each element, Q. For the circu...

Q. For the circuit shown in Figure, develop and execute a PSpice program to obtain the node voltages and the current through each element.

Variability in oxidation state of transition metals, What do you mean by va...

What do you mean by variability in oxidation state of transition metals different from that of the non transition metals? Illustrate with examples.

What is ringtopology, Q. What is RingTopology? In ring topology, all us...

Q. What is RingTopology? In ring topology, all user nodes are connected with physical path acting as links of a chain and last user node is connected back to the first node. A

Planning and research in power system, Q. Planning and Research in power sy...

Q. Planning and Research in power system? Energy research worldwide is assuming top priority, in particular because of economic, en - vironmental, and resource constraints. DOE

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd