Design approach for the spacing of min-piles, Civil Engineering

Design approach for the spacing of min-piles

For close spacing of min-piles, it would provide substantial cost savings with reduction of pile cap size. Though close spacing of piles implies the problem of group effect that tends to decrease the load carrying capacity of every pile member. Notwithstanding this, there is well established rule that govern the minimum spacing of piles it implies for friction piles such as mini-piles, centre-to-centre spacing must not be less than the perimeter of the pile.

Posted Date: 8/7/2013 7:17:26 AM | Location : United States







Related Discussions:- Design approach for the spacing of min-piles, Assignment Help, Ask Question on Design approach for the spacing of min-piles, Get Answer, Expert's Help, Design approach for the spacing of min-piles Discussions

Write discussion on Design approach for the spacing of min-piles
Your posts are moderated
Related Questions
Q. Bleeding test for grout – an essential requirement? Bleeding is a form of segregation in that a layer of water migrates to surface of the grout at the time of the initial st

Define the Cavitation - underwater inspection of bridge? Cavitation damage is caused by repeated impact forces caused by collapse of vapour bubbles in rapidly flowing water. Th

types mixing,curing,water cement ratio,qualities and workability

Q. Paint system to protect steelwork from corrosion? In a typical painting system, there are generally three main layers primer, undercoat and finishing coat. Primer acts as th

can you please provide with an example for mobilisation and demobilisation plan, induction and deployment schedule, broad execution schedule in excel,quantity schedule for major qu


Atomic weight of an atom is equal to? Answer: sum of the number of protons and neutrons.

Define Limitations of Radiography - Underwater Inspection of Bridge? i. Radiography is a costly and time consuming method, which re- quires extensive safety measures to be adop

find the area bounded by the curve y=3x(x-2)^2 and the x-axis

What are the problems in under water concreting?