Define the concept of creep of concrete, Civil Engineering

Assignment Help:

Define the concept of Creep of Concrete

Creep of concrete is another important characteristic. It represents progressive strains in concrete which occur at constant value of stresses. It depends on the level of stress in the concrete, age at loading and the duration of loading in addition to those factors which affect the shrinkage of concrete. As long as the stress in concrete does not exceed one-third of characteristic strength of concrete, creep may be assumed to be proportional to stress. The ultimate creep strain may be estimated from the following values of creep coefficient (which is defined as the ratio of ultimate creep strain and elastic strain at the age of loading). The ultimate creep strain does not include the elastic strain.

 


Related Discussions:- Define the concept of creep of concrete

Highway Engg, what are lab and field test carried on soil subgrade

what are lab and field test carried on soil subgrade?

To make open sqare &rectangular, how to calculate the section weight for op...

how to calculate the section weight for open square tube

What are the parasitic forces for prestressing, Q. What are the Parasitic f...

Q. What are the Parasitic forces for prestressing? In statically determinate structures, prestressing forces will cause the concrete structures to end upwards. Therefore precam

Shallow foundations, The drainage system of a cantilever wall shown in Figu...

The drainage system of a cantilever wall shown in Figure As 1 became blocked after a heavy rainstorm and the groundwater level, which was originally below the base, rose to1.5 (m)

Load carrying element of min-piles, Q. A pipe or groups of bars be adopted ...

Q. A pipe or groups of bars be adopted as load carrying element of min-piles? The design of mini-piles someway differs from other traditional pile types. For example the design

Water treatment, what is filtration membrane, is it''s type mechanism

what is filtration membrane, is it''s type mechanism

Calculate the amount of cubic yards of soil, A proposed building site requi...

A proposed building site requires 135,000-ft 3 of imported fill.  A borrow site is located 5-miles Northeast of the project site where the soil has a shrinkage of 16%.  The amount

Landslides - road under special conditions, Landslides: Landslides ar...

Landslides: Landslides are common in the Himalayan hill roads. The main causes contributing to landslides are: (a) Removal of lateral support at the bottom of a hill due t

What is objective method of assessment, Q. What is objective method of asse...

Q. What is objective method of assessment? Track recording consists of objective method of assessment of the quality of track with the help of sophisticated equipments. A conti

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd