Determine the grade rod reading at station, Civil Engineering

Assignment Help:

A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft and slopes at 2% grade. The grade rod reading at station 55+00 is most nearly:

Solution:

The Height of Instrument elevation can be calculated:

HI = 100.00-ft + 8.5-ft = 108.5-ft

The grade rod reading at station 50+00 is calculated by:

HI - station 50+00 elevation = 108.50-ft - 95.00-ft = 13.50-ft

The distance between station 50+00 and 55+00 is 500-ft

The slope is set at 2%, therefore; 2% x 500-ft = 10-ft elevation difference between stations.

Add the results of the proposed roadbed slope which is 10-ft to the grade rod reading at station 50+00 to obtain the grade rod reading at station 55+00 which is 23.50-ft.


Related Discussions:- Determine the grade rod reading at station

Washer – necessary for bolts, Q. Washer – necessary for bolts? 'Fastene...

Q. Washer – necessary for bolts? 'Fastener' is a general term which is used to describe something that is used as a restraint for holding things together or attaching them to o

Designing of access ramps for drainage channels, Question Designing of ...

Question Designing of access ramps for drainage channels, why must direction of access ramps is sloping down on the way to downstream ? Answer In designing of access

Levelling, principle of direct levelling

principle of direct levelling

Moisture content, What is moisture content for road work

What is moisture content for road work

Distomat, write short note on distomat with applications

write short note on distomat with applications

Marine pilling, what are the problems in traditional marine pilling system ...

what are the problems in traditional marine pilling system of steel tubular pile with concrete infill

Formation of holes in pipelines, Question While branch pipelines are co...

Question While branch pipelines are connected to pipelines, now and then Y-junctions or fitting branched pipelines to key pipelines by formation of holes in pipelines are u

Road base and base course in flexible carriageway, Road base vs. base cours...

Road base vs. base course in flexible carriageway Roadbase is the most significant structural layer in bituminous pavement. It's designed to take up the function of distributi

Elimination of formwork with reasons, Question For a l ong slender structur...

Question For a l ong slender structure similar to beams, propping is compulsory after elimination of formwork with reasons? Answer After concreting, time at which arresting of

Construction health & safety, List different access equipment & their uses ...

List different access equipment & their uses wih pictures

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd