A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft and slopes at 2% grade. The grade rod reading at station 55+00 is most nearly:
Solution:
The Height of Instrument elevation can be calculated:
HI = 100.00-ft + 8.5-ft = 108.5-ft
The grade rod reading at station 50+00 is calculated by:
HI - station 50+00 elevation = 108.50-ft - 95.00-ft = 13.50-ft
The distance between station 50+00 and 55+00 is 500-ft
The slope is set at 2%, therefore; 2% x 500-ft = 10-ft elevation difference between stations.
Add the results of the proposed roadbed slope which is 10-ft to the grade rod reading at station 50+00 to obtain the grade rod reading at station 55+00 which is 23.50-ft.
Grouted or Penetration Macadam: This is a specification where the binder is sprayed on a compacted layer of stone aggregates and is allowed to penetrate and bind the aggregat
Q. Why we use Air Valves? Air Valves - Air valves of proper size and pressure rating at summits. Air valves ensure the safety of the pipe line against collapse when at points o
a pilot entering a bay on course
Types of Cross-drainage Structures: The following are the types of cross-drainage structures : (a) Culverts, having waterway upto 6 m. (b) Minor Bridges, having waterwa
Tension reinforcement leads to increasing deflection in concrete structures? In BS8110 a modification factor is applied to span/depth ratio to take into account effect of tens
what is reciprocal ranging?
Pre-tensioning systems In the previous unit we have seen different steps in a pretensioning operation. Tendon wires or strands (formed as a rope type arrangement made of sever
Q. Butt weld – from one side vs from both sides? In the design of butt weld strength, it's normally presumed that its strength is at least equivalent to parent metal. To improv
horizontal and verticle allignment
1. 130,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%. The final volume of the compacted
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd