Determine the grade rod reading at station, Civil Engineering

Assignment Help:

A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft and slopes at 2% grade. The grade rod reading at station 55+00 is most nearly:

Solution:

The Height of Instrument elevation can be calculated:

HI = 100.00-ft + 8.5-ft = 108.5-ft

The grade rod reading at station 50+00 is calculated by:

HI - station 50+00 elevation = 108.50-ft - 95.00-ft = 13.50-ft

The distance between station 50+00 and 55+00 is 500-ft

The slope is set at 2%, therefore; 2% x 500-ft = 10-ft elevation difference between stations.

Add the results of the proposed roadbed slope which is 10-ft to the grade rod reading at station 50+00 to obtain the grade rod reading at station 55+00 which is 23.50-ft.


Related Discussions:- Determine the grade rod reading at station

Grouted or penetration macadam, Grouted or Penetration Macadam: This ...

Grouted or Penetration Macadam: This is a specification where the binder is sprayed on a compacted layer of stone aggregates and is allowed to penetrate and bind the aggregat

Why we use air valves, Q. Why we use Air Valves? Air Valves - Air valve...

Q. Why we use Air Valves? Air Valves - Air valves of proper size and pressure rating at summits. Air valves ensure the safety of the pipe line against collapse when at points o

Trigo, a pilot entering a bay on course

a pilot entering a bay on course

Types of cross-drainge structures, Types of Cross-drainage Structures: ...

Types of Cross-drainage Structures: The following are the types of cross-drainage structures : (a) Culverts, having waterway upto 6 m. (b) Minor Bridges, having waterwa

Deflection in concrete structures, Tension reinforcement leads to increasin...

Tension reinforcement leads to increasing deflection in concrete structures? In BS8110 a modification factor is applied to span/depth ratio to take into account effect of tens

Explain about the pre-tensioning systems, Pre-tensioning systems In the...

Pre-tensioning systems In the previous unit we have seen different steps in a pretensioning operation. Tendon wires or strands (formed as a rope type arrangement made of  sever

Butt weld – from one side vs from both sides, Q. Butt weld – from one side ...

Q. Butt weld – from one side vs from both sides? In the design of butt weld strength, it's normally presumed that its strength is at least equivalent to parent metal. To improv

Calculate the final volume of the compacted soil, 1. 130,000-yd 3 of banke...

1. 130,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%.  The final volume of the compacted

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd