A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft and slopes at 2% grade. The grade rod reading at station 55+00 is most nearly:
Solution:
The Height of Instrument elevation can be calculated:
HI = 100.00-ft + 8.5-ft = 108.5-ft
The grade rod reading at station 50+00 is calculated by:
HI - station 50+00 elevation = 108.50-ft - 95.00-ft = 13.50-ft
The distance between station 50+00 and 55+00 is 500-ft
The slope is set at 2%, therefore; 2% x 500-ft = 10-ft elevation difference between stations.
Add the results of the proposed roadbed slope which is 10-ft to the grade rod reading at station 50+00 to obtain the grade rod reading at station 55+00 which is 23.50-ft.
define couple
Distortion energy theory: Let us now consider the solid shown in Figure. (a) By inspection we may see that the solid is safe according to principal stress theor
what is hydraulic grid line
scientific problem in construction
Q. Longitudinal steel – an enhancement of shear strength ? Furthermore to shear resistance provided by shear reinforcement, shear forces in a concrete section is also resisted
Define Structural connection loosening - Deterioration in Steel? Structural connections joined together by rivets or bolts have a tendency to work loose over an extended period
Explain some Important Points for Hazardous Waste The mixture rule prevents dilution of waste for the purposes of escaping RCRA regulation. Mixtures of a listed hazardous w
what is the taxonomy of phylum molluska
Magnitude of torque - bending moment: A prismatic bar of hollow circular cross-section along with outer and inner diameters 100 mm and 80 mm correspondingly, carries a bending
Define the Precedence Diagramming Methods a) Activity on Node (AON) with arrows for dependencies b) Uses all forms of precedence relationships
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd