Determine the grade rod reading at station, Civil Engineering

Assignment Help:

A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft and slopes at 2% grade. The grade rod reading at station 55+00 is most nearly:

Solution:

The Height of Instrument elevation can be calculated:

HI = 100.00-ft + 8.5-ft = 108.5-ft

The grade rod reading at station 50+00 is calculated by:

HI - station 50+00 elevation = 108.50-ft - 95.00-ft = 13.50-ft

The distance between station 50+00 and 55+00 is 500-ft

The slope is set at 2%, therefore; 2% x 500-ft = 10-ft elevation difference between stations.

Add the results of the proposed roadbed slope which is 10-ft to the grade rod reading at station 50+00 to obtain the grade rod reading at station 55+00 which is 23.50-ft.


Related Discussions:- Determine the grade rod reading at station

Water retaining structure, Question Why do BS8007 specify permissible c...

Question Why do BS8007 specify permissible crack width of water retaining structure as 0.2mm for severe, extremely severe exposure? Answer For break width less than

Verify the void ratio and water content, Derive the relation among void rat...

Derive the relation among void ratio (e), specific gravity of particles (G) and moisture content at full saturation (w). A certain sample of saturated soil in a container weighs

Surveying, what are the basic two division of surveying

what are the basic two division of surveying

Design nominal reinforcement for staircase, Question Given a 1meter hig...

Question Given a 1meter high staircase resting on solid concrete, could it be adequate to design nominal reinforcement for staircase? Answer For design of staircase,

Estimate Bridge Pier Concrete, Takeoff the 3 elements for the following bri...

Takeoff the 3 elements for the following bridge pier components: 1. Pier Footing, 2. Pier Column, 3. Pier Cap (Top). • Misc Items to include Shear Key. • Misc Items to exclude Reba

Which direction of reinforcement must be provided, Question In the desi...

Question In the designing of a simply supported skew bridge , which direction of reinforcement must be provided? Answer In conventional design of steel reinforcement f

Higway engineering, Ask question Design the pavement by group index method ...

Ask question Design the pavement by group index method for heavy traffic using following subgrade data Soil passing 75micron sieve =65%,liquid limit =40%plastic limit =20% #Min

Uses of stones, Uses of Stones Stones are used in the following civil e...

Uses of Stones Stones are used in the following civil engineering constructions are described: (i) Stone masonry which is used for the construction of foundations, , columns

Define types of deterioration in steel substructure, Define Types of Deteri...

Define Types of Deterioration in Steel Substructure There are 5 major types of deterioration in steel substructure in the marine environment: - Corrosion - Abrasion - Loo

Write Your Message!

Captcha
Free Assignment Quote