Important information about Quantitative analysis:Networks, PERT, critical path.
A project was planned using PERT with three times estimates. The expected completion time of the project was determined to br 40 weeks. The variance of the critical path is 9.

A What is the probability that the project will be finished in 40 weeks or less?

B. What is the probability that the project takes longer than 40 weeks?

C. What is the probability that the project will finished in 46 weeks?

D. What is the probability that the project tilll take longer than 46 weeks?

E. The project manager wishes to set the due date for the completion of the project so that there is a 90% chance of finishing on schedule. Thus, there would only be a 10% chance the project would take longer than this due date. What should this due date be?

Reference no: EM13119229

Questions Cloud

Explain is a z- or t-value test appropriate for situation : Perform an appropriate hypothesis test, showing all critical steps. Do you support Bob's claim that citizens in his area spend more than $75 per year? Explain why or why not.
Graphing a parabolic equation : If I have a quadratic equation (y = x^2 - 2x - 8)) that graphs to a parabola with a minimum value at the vertex (1, -9), how would you find the maximum value for the equation?
Calculate the percent yield : Methane and hydrogen sulfide form when 36g H2 reacts wih carbon disulfide, calculate the percent yield if the actual yield of CH4 is 69.8g.
Illustrate what is the magnitude of the change in magnetic : The loop is leaving a region in which a 2.8 T magnetic field exists; the magnetic field outside this region is zero. During a time of 2.0 s, illustrate what is the magnitude of the change in the magnetic flux?
Vital information about quantitative analysis networks : Vital information about Quantitative analysis:Networks, PERT, critical path. A project was planned using PERT with three times estimates. The expected completion time of the project was determined to br 40 weeks
Deduce the inheritance of these phenotypes : Deduce the inheritance of these phenotypes; use clearly defined genetic symbols of your own invention. State the genotypes of all 3 generations and the genotypic proportions of the F1 and F2.
Area of a parallelogram : How do I find a trinomial A (x) that represents the area of a parallelogram whose base is 3x + 2 meters and whose height is 2x + 3 meters. Find A (3).
Find out the coefficient of kinetic friction : Find out (a) the coefficient of kinetic friction between m2 and the incline, (b) the acceleration of each mass, and (C) the tension in the string.
Determining reconciled balance : The bank statement for Burton Co. revealed a balance of $1,475.00 while the checkbook balance showed a balance of $1,822.00. Outstanding checks totaled $185.00.

Reviews

Write a Review

Mathematics Questions & Answers

  Questions on ferris wheel

Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.

  Logistic map

This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.

  Finding the probability of cards

This assignment has questions related to probabiltiy.

  Systems of ode

Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.

  Derive the boolean expression

Derive the Boolean Expression and construct the switching circuit for the truth table stated

  System of equations

Evaluate which equations are under-identified, just-identified, and over-identified.

  Linear programming problem

Linear programming problem consisting of only two constraints with one objective function.

  Find the natural domain

Find the natural domain of the given functions.

  Introduction to numerical methods

Compute the coecients of the polynomials using the term recurrence relation.

  Chart of the topological manifold

De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.

  Mathematics in computing

Questions related on mathematics in computing.

  Complex problems

Complex problems

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd