Identify the critical path and other paths through network

Assignment Help Computer Networking
Reference no: EM13834877

This assignment consists of four parts.

Part 1: Develop an in-depth schedule for your initial project based on the Work Breakdown Structure you completed in Unit III. Please refer to the Integrated Project in Chapter 10 of the textbook on page 318 for more information.

Be sure to include:

1. An activity precedence diagram

2. An activity duration table

3. A network diagram and Gantt charts

Part 2: Please complete Case Study 10.2, "Project Scheduling at Blanque Check Construction" on pages 315 and 316 in the textbook and respond to the questions for discussion. Please make sure that each question is answered thoroughly using a minimum of 200 words for each case study question.

Part 3: Develop the network activity chart and identify the critical path for a project based on the information provided in the Gantt Chart Activity document. To access the Gantt chart activity document, click here.

1. Draw the activity network as a Gantt chart.

2. What is the expected duration of the project?

Part 4: Consider the project with the information provided in the Project Activity Network document. To access the Project Activity document, click here or on the link above.

1. Construct the project activity network using AON methodology and label each node.

2. Identify the critical path and other paths through the network.

Pinto, J. K. (2010). Project management: Achieving competitive advantage (2nd ed.). Upper Saddle River, NJ: Prentice Hall.

Reference no: EM13834877

Questions Cloud

Find a current article about business strategy : Find a current article about business strategy and write a 1- to 2-page paper discussing its relevance to the Week 5 team project; Bubble Films
What would have made the process go smoother : Describe the stages the group experienced in the context of Tuckman's stages. Please describe the situations involved. What would have made the process go smoother
How many kilojoules of energy does the bench absorb : How many kilojoules of energy does the bench absorb
Summarize the elements of the entrepreneurial process : Summarize the elements of the Entrepreneurial process. Use credible sources with in-text citation and create a references section
Identify the critical path and other paths through network : Construct the project activity network using AON methodology and label each node. Identify the critical path and other paths through the network
Explanation of the benefits and limitations of the approach : An explanation of which approach (health-planning or community development) would be most appropriate for the community problem you described as part of your Scholar-Practitioner Project. Justify your choice by providing an explanation of the bene..
Conduct a swot analysis on the case study : Answer provides correct and complete information demonstrating critical thinking: Conduct a SWOT Analysis on the case study company's CSR and business ethics practices
Increasing the promotional budget for a product : Increasing the promotional budget for a product in order to increase awareness is not advisable in the short run under which of the following circumstances?
Affect net exports at any given exchange rate : The rise in the US trade deficit during the 1980s was due largely to the rise in the US budget deficit. On the other hand, the popular press sometimes claims that the increased trade deficit resulted from a decline in the quality of US products relat..

Reviews

Write a Review

 

Computer Networking Questions & Answers

  A company is interested in upgrading its current core

a company is interested in upgrading its current core infrastructure which comprises 2 100mbps switches which connect

  Demonstrate with a high degree of confidence that errors

The goal of testing is to demonstrate that the software satisfies its requirements and to demonstrate with a high degree of confidence that errors, which could lead to unacceptable failure condition, have been removed.

  Design a wide area network wan between offices

Design a wide area network WAN between offices that includes the appropriate math calculations to meet the bandwidth. Describe the general type of LAN connections and hardware that will be used to interconnect the offices.

  Wireless and wired connections and a broadband connection

Describe the hardware you will purchase or build (inclusive of computers, memory, storage, video cards, printers, routers and cabling). Justify your hardware selection.

  Explain why you think the network is effective and efficient

Examine its network design and explain why you think the network is effective and efficient. Recommend a better network design which can support the decisions and operations of the business if there is any.

  What are the demerits that this method poses for your

q1. why might read write and read create rights pose a security threat?q2. how do clients receive updates in the

  Computer memory hacking and hacking of ram

Describe what hacking of memory or hacking of RAM means. Examine the common tools that hackers use to hack into memory of computing devices. Detail two (2) real-life examples of such tools in action.

  Determine the theoretical maximum channel capacity

Given narrow (usable) audio bandwidth of telephone transmission facility, nominal SNR of 56dB (400,000). What can we say about actual maximum channel capacity?

  Tcpipproblem 1bullexplain what is the biggest problem in

tcpipproblem 1.bullexplain what is the biggest problem in routing security and you may not all agree on which problem

  What are the pitfalls of networking

By now, we should all know the "benefits" of networking from a technological sense (being more efficient, productive, etc.). However, based on your experience, what are the pitfalls of networking?

  You are the network engineer contracted to established the

you are the network engineer contracted to established a wan connectivity between two office locations for a local

  Data Network Identification Code

Discuss the christian concept of trinity and messiah How many digits of the DNIC (Data Network Identification Code) identify the country?  A station in a network forwards incoming packets by placing them on its shortest output queue. What routing al..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd