Find index r and recurrence relation compute

Assignment Help Civil Engineering
Reference no: EM13545586

1.Use the Frobenius method to solve: xy"-y=0 . Find index r and recurrence relation. Compute the first 5 terms (a0 - a4) using the recurrence relation for each solution and index r.

2.You will be using a large crane... lets say one with a capacity of 30T. What considerations need to be made prior to picking up a 15T load with the crane? If you are familiar with the use of a crane be sure to include the discussion of the outriggers and other safety features.

Reference no: EM13545586

Questions Cloud

How siphon works and what is its drawing : Biofilter AND dry sludge bed are part of the sewage treatment plant. Please let me know whether we can cover these facilities or not and what is micro-biological process in these. If we can provide cover than what will be the effect on its biological..
What is the minimum required length l of the rod so that the : What is the minimum required length L of the rod so that the cross section at one end can be rotated 90 degree with respect to other end without exceeding the allowable shear stress of 300 MPa
Find the principle stresses and max shearing stresses : A circular beam length 36 inches and diameter 1 inch is supported on the left end by a pin joint and the right end with a roller. The beam is under axial tension with forces of 1000 lbs out of each end.
To orient a transit in azimuth when the transit is set up : To orient a transit in azimuth when the transit is set up over a point D, a backsight is taken to another point, C, with vernier A set at the azimuth of the line CD and with the telescope in its inverted position
Find index r and recurrence relation compute : You will be using a large crane... lets say one with a capacity of 30T. What considerations need to be made prior to picking up a 15T load with the crane? If you are familiar with the use of a crane be sure to include the discussion of the outriggers..
Determine its changes in kinetic and potential energy : An automobile having a mass of 900 kg initially moves along a level highway at 100 km/hr relative to the highway. It then climbs a hill whose crest is 50m above the level highway and parks at a rest area located there
What is the difference among cement plaster : If the tangents intersect at an angle of 40 degrees, what is the highest degree of curve that can be used?..how to solve this problem using chord basis formula?
Determine the volume of each cfstr : Disinfection by ozone follows first-order kinetics, with a rate constant of 1.2/minute. The town of Obfisquitory wishes to use 4 equal volumes of CFSTR's in series to disinfect 2 million gallons per day (mgd) of water containing 1000 coliforms/L to t..
What is the maximum length of trench that can excavated by : What is the maximum length of trench that can excavated by hand economically rather than by a trenching machine. it cost 900.00 to transport a trenching machine to the job and back to the storage yard. the trenching machine can excavate 265 linear fe..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the rotation of the gear at e of a-36 steel

The two shafts are made of A-36 steel. Each has a diameter of 25 mm and they are connected using the gears fixed to their ends. Their other ends are attached to fixed supports at A and B.

  Determine what would the deflection be at the right end

A 2-inch by 2-inch solid steel beam (18 inches long) is fixed to the wall at the left to resist applied moment (20,000 lbs-inch). What would the deflection be at the right end Up or down

  Find the rate of discharge of water at 60 degrees fahreneit

The 24-in pipe leads from a reservoir (flush entrance), and the 18-in pipe discharges into the air at a point 15 ft lower than the reservoir water surface level. Assuming all changes in section to be abrupt

  Find the area of the parallelogram with vertices

Find the area of the parallelogram with vertices: P(0,0,0), Q(-2,4,0), R(-2,2,-2), S(-4,6,-2).

  Calculate how much bod is remaining after 12 days

A 250 cubic meter reaction tank contains a waste water having an ultimate BOD concentration of 755 mg/L. If the BOD reaction rate constant is -0.352/day, how much BOD is remaining after 12.0 days

  Determine to the nearest 1 by 4 in the smallest dimension h

If A and B are both made of wood and are 3/8 in thick, determine to the nearest ¼ in the smallest dimension h of the support so that the average shear stress does not exceed \tauallow = 300 psi.

  Determine what is the maximum steady speed in mph

A vehicle of mass 2000 kg coasts along a horizontal track against a drag force Fd (in N) on the automobile given by the following Fd=kV^2 where k= 1.25 kg/m and V is the speed in m/s.

  Find what is the angle that is formed by the crane boom

A crane is placed along the easterly sideline of a building, but 25 feet from the front of the building. The building to be erected is a 6 story building that is 100 feet wide by 50feet deep. YOu may assume that each story is 15 feet.

  Define what speed would the train have to be traveling

The beam is positioned such that the observer on the train measures an angle of 19 between the crossbeam and the floor of the train. At what speed would the train have to be traveling in order for an observer standing outside the train

  Find the absolute-gage and vacuum pressure heads

A glass jar is heated in an oven and sealed when the air pressure is 103 kPa and the temperature is 105 C. Find the absolute, gage, and vacuum pressures in the jar when it cools to 20 C.

  Calculate actual cost-earned value and planned value

he project duration is planned for 20 weeks. The project budget is $40,000 and is planned to be spent on a level bases through out the project. You are at the end of week 10, the accounting department tells you the project has spent $19,500

  Determine the horizontal and vertical components at pin c

the jib crane is supported by a pin at c and a rod at ab if the load has a mass of 2Mg with its com located at g determine the horizontal and vertical components of the reaction at the pin c

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd