Find what is the angle that is formed by the crane boom

Assignment Help Civil Engineering
Reference no: EM13299147

A crane is placed along the easterly sideline of a building, but 25 feet from the front of the building. The building to be erected is a 6 story building that is 100 feet wide by 50feet deep. YOu may assume that each story is 15 feet. The shakeout ple for the structural steel is located 50 feet west of the crane, but on a line with the centerline of crane.

A. what is the minimum legth needed for the boom of the crane in order for the crane to reach the shakeout

B. what is the minimm length needed for the boom of the crane in order for the crane to reach the northeast corner of the 6th floor? (NOte: you may assume that the bottom point of the boom is located at ground leve and you will need a 10 foot clearance between the end of the boom and the floor of the 6th floor.)

C. What is the angle that is formed by the crane boom when it is in the position in Part B?

Reference no: EM13299147

Questions Cloud

Determine the water depth at 30 m upstream of the brink : The channel entrance is rounded and smooth (negligible head loss at entrance), and the reservoir water surface is 2.5 m above the bed of the channel at the entrance. hf=0.00019*Q2, where Q (in m3/s) is the discharge in the channel.
Aware of the purchase requirements : How purchasing department becomes aware of the purchase requirements
At what price should the annual payment bond sell : The firm's Class Ann bonds have the same risk, maturity, nominal interest rate, and par value, but these bonds pay interest annually. Neither bond is callable. At what price should the annual payment bond sell?
Straight-line method of depreciation : Depreciation is computed for the exact period of time during which the asset is owned and depreciation is computed for the full year on the January 1 balance in the asset account.
Find what is the angle that is formed by the crane boom : A crane is placed along the easterly sideline of a building, but 25 feet from the front of the building. The building to be erected is a 6 story building that is 100 feet wide by 50feet deep. YOu may assume that each story is 15 feet.
Karleen goerke : Write an initial substantive response of 50 words in length. Begin your response with a restatement of the question/prompt, and include in-text citation(s) and a reference for each scholarly source used according to the APA guidelines found in the AP..
What cash flow must the investment provide : Your regard 8% as an appropriate rate of return on a low risk but illiquid 7 year loan. What cash flow must the investment provide at the end of each of the final 4 years, that is, what is X?
How much must the grandfather put into ed trust : how much must the grandfather put into Ed's trust today and each subsequent year to enable him to have the same retirement nest egg as Steve after the last payment is made on their 65th birthday?
Find where is the final image relative to second lens formed : Two converging lenses, each of focal length 14.5 cm, are placed 59.2 cm apart, and an object is placed 27.4 cm in front of the first. Where is the final image relative to the second lens formed

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine speed at which student conducted her experiment

A student is trying to test the braking ability of her car determined that she needed 18.5 ft more to stop her car when driving downhill on a road segment of 5% grade than when driving downhill at the same speed along another segment of 3% grade.

  Using pestan model for a project

I want to use PESTAN model for a project, can you please tell me any real scenario with available data on which I can formulate a project preferably related to oklahoma.

  Plot the variation with depth

Plot the variation with depth (z) of the at-rest lateral earth pressure behind the wall, and determine the magnitude and location of the at-rest lateral earth force per unit length of wall.

  Determine what is the book value at the end of year 3

A hybrid car has a initial cost of $70,000 is to be depreciated by the straight-line method over a six years. The asset will a salvage value of $10,000. According to the straight line method, the book value at the end of year 3 is

  Estimate the storage change for the lake during the month

A lake with a surface area of 1050 acres was monitored over a period of time. During a one month period, the inflow was 33 cfs, the outflow was 27 cfs, and a 1.5 in seepage loss was measured.

  Determine the velocity of slider block c

Determine the velocity of slider block C at t=0, (b) the acceleration of A and C, (c) the change in position of block A after 5s.

  Determine what is the stationing of the pt

A crest vertical curve and a horizontal curve on the same highway have the same design speed. The equal-tangent vertical curve connects a +3% initial grade with a +1% final grade and has a PVC at 101+78 and a PVT at 106+72

  Rate of diameter increasing of a balloon

A balloon is being inflated at the rate of 15m^3/min. At what rate is the diameter increasing after 5 min? Assume that the diameter is zero at time zero.

  How man n of water must be added to the sample to increase

A moist soil sample weighing 22.2 N has a moisture content of 20%. How man N of water must be added to the sample to increase the moisture content to 30%

  What and where will be the maximum fluid pressure

A 10cm diameter vertical tank holds 20cm of water topped with 15cm of ethyl alcohol. The cylinder is rotated about its central axis at a rotation rate of 20 rad/s. (a) What will be the shape of the air-alcohol and alcohol-water interfaces

  What is the percent yield

Carbon disulfide (CS2) reacts with excess chlorine (Cl2) to produce carbon tetrachloride (CCl4) and disulfur dichloride (S2Cl2). If 69.7 g of CS2 yields 62.6 g of CCl4, what is the percent yield? (Hint, you must first write the balanced equation.)

  What is force of water on spillway whose upstream is given

What is the force of the water on a spillway whose upstream depth is 1.2m and whose downstream depth is 0.2m. The width of the spillway is 3m.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd