Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A crane is placed along the easterly sideline of a building, but 25 feet from the front of the building. The building to be erected is a 6 story building that is 100 feet wide by 50feet deep. YOu may assume that each story is 15 feet. The shakeout ple for the structural steel is located 50 feet west of the crane, but on a line with the centerline of crane.
A. what is the minimum legth needed for the boom of the crane in order for the crane to reach the shakeout
B. what is the minimm length needed for the boom of the crane in order for the crane to reach the northeast corner of the 6th floor? (NOte: you may assume that the bottom point of the boom is located at ground leve and you will need a 10 foot clearance between the end of the boom and the floor of the 6th floor.)
C. What is the angle that is formed by the crane boom when it is in the position in Part B?
A student is trying to test the braking ability of her car determined that she needed 18.5 ft more to stop her car when driving downhill on a road segment of 5% grade than when driving downhill at the same speed along another segment of 3% grade.
I want to use PESTAN model for a project, can you please tell me any real scenario with available data on which I can formulate a project preferably related to oklahoma.
Plot the variation with depth (z) of the at-rest lateral earth pressure behind the wall, and determine the magnitude and location of the at-rest lateral earth force per unit length of wall.
A hybrid car has a initial cost of $70,000 is to be depreciated by the straight-line method over a six years. The asset will a salvage value of $10,000. According to the straight line method, the book value at the end of year 3 is
A lake with a surface area of 1050 acres was monitored over a period of time. During a one month period, the inflow was 33 cfs, the outflow was 27 cfs, and a 1.5 in seepage loss was measured.
Determine the velocity of slider block C at t=0, (b) the acceleration of A and C, (c) the change in position of block A after 5s.
A crest vertical curve and a horizontal curve on the same highway have the same design speed. The equal-tangent vertical curve connects a +3% initial grade with a +1% final grade and has a PVC at 101+78 and a PVT at 106+72
A balloon is being inflated at the rate of 15m^3/min. At what rate is the diameter increasing after 5 min? Assume that the diameter is zero at time zero.
A moist soil sample weighing 22.2 N has a moisture content of 20%. How man N of water must be added to the sample to increase the moisture content to 30%
A 10cm diameter vertical tank holds 20cm of water topped with 15cm of ethyl alcohol. The cylinder is rotated about its central axis at a rotation rate of 20 rad/s. (a) What will be the shape of the air-alcohol and alcohol-water interfaces
Carbon disulfide (CS2) reacts with excess chlorine (Cl2) to produce carbon tetrachloride (CCl4) and disulfur dichloride (S2Cl2). If 69.7 g of CS2 yields 62.6 g of CCl4, what is the percent yield? (Hint, you must first write the balanced equation.)
What is the force of the water on a spillway whose upstream depth is 1.2m and whose downstream depth is 0.2m. The width of the spillway is 3m.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd