A falling-head permeability test is being conducted on a saturated sample of clayey silt having hydraulic conductivity of 6.5 x 10-9 m/s. The diameter and the length of the sample are 100 mm and 150 mm, respectively. If a 5 mm diameter standpipe is used and the initial height of water in the standpipe (measured from the datum taken at the base of the soil sample) is 1.0 m, calculate the height of water in the standpipe after 4 hours.
What is the theoretical maximum amount of work that could be done by a gas in a piston expanding from 10 L to 20 L (pressure of the surrounding atmosphere is 100 KPa)
A 3-ft diameter column with weight of 150 kg is placed on top of 1 m thick aggregate layer. The soil beneath the aggregate layer is sand. The friction angle of the aggregate is 36 degrees and the unit weight is 22 lb/ft3. What is the pressure acti..
Find the magnitude and direction of the force the cable exerts on the pin for the pulleys
A water main springs a leak and the geyser is estimated to be 20 feet in height. It is also estimated that about 300 gallons per minute is leaking based on flow into gutter. About how big is the hole in the water pipe
If a certain EDM has a centering error of 3mm and a scalar error of 3ppm, what is the uncertainty in a observed distance of 1380.25 ft
Determine largest load P that can be applied without any cable exceeding its yield strength. Bar length in 10 ft with aluminum directly in the center and steel cables 5 feet on either side. Steel cable lengths are 8 ft and aluminum cable is 10 ft...
A stabilization pond is designed for a 35-day detention time. If the pond is maintained at a capacity of 40 acre-feet, what is theaverage gpd flow to the stabilizaiton pond
An industrial waste water treatment plant discharges into a large river. the industrial waste water is at 1m^3/s and contains an ultimate BOD concentration of 300mg/L at a temperature of 30 degrees C and a DO concentration of 2.5mg/L
assuming that the contaminant travels mainly by advection, propose any operational changes to the given layout to prevent the river from being contaminated.
Calculate the largest tolerable internal crack length for a 7075-T651 aluminum alloy component that is loaded to a stress one-half of its yield strength without catastrophic fracture. For the alloy, the plane strain fracture toughness is 24 and yi..
An effluent holding pond to be used as part of a spray irrigations system is being built. The holding pond is located 2.5 miles awary for the 10 mgd WWTP which will supply the effluent
Draw the influence line for the shear at point B. Plot numerical values every 5 ft. Assume the support at A is a roller and C is fixed. EI is constant.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd