What is thermo-electric prestressing, Civil Engineering

Assignment Help:

What is Thermo-electric prestressing

We know that, stretched tendons are used in prestressed concrete. Stretching of tendons may be accomplished by using jacks or by other means. Thermo-electric prestressing is just another method of stretching the tendon wiers. We know that if we increase the temperature of a metal, it expands. As the name suggests, in Thermo-electric prestressing, temperature of tendon wires is increased by passing electric current for a short duration. This temperature increase, taking place within 3-5 minutes, may be of an order of 300-400°C. The bars, which may undergo an expansion of about 0.4-0.5% in length, try to shorten at cooling butare checked by fixed anchors at the two ends. 


Related Discussions:- What is thermo-electric prestressing

Pipes, difference between delievery and suction pipe?

difference between delievery and suction pipe?

Fundamental of physics, state and prove Heisenberg uncertainity principle?

state and prove Heisenberg uncertainity principle?

Bridge designing, Could someone please help me understand the basics of bri...

Could someone please help me understand the basics of bridge designing

Define the frame column analysis, Define the Frame Column Analysis 1. B...

Define the Frame Column Analysis 1. Based on if a column section is a braced frame or unbraced frame. 2. Braced frame-indicates buckling mode shape does not involve tr

Concrete cracking, Attached information shows construction details of a wat...

Attached information shows construction details of a water tank. The slab was poured in one pour and the walls (incl. Baffles) were poured in two even sections. Forms were stripped

Remedial proposal to rectify situation, Question During deep excavatio...

Question During deep excavation , neighbouring ground water table is drawn down that might affect settlement of nearby buildings. What is remedial proposal to rectify situatio

Highway engineering., history and development of indian road and planning

history and development of indian road and planning

Settlement due to lowering of water table, Q. Settlement due to Lowering of...

Q. Settlement due to Lowering of Water Table? Water table is encountered with, whenever any excavations are made for foundations. The water is to be out for working conditions.

Determine the late start time for activity, For the project network shown, ...

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd