What is Thermo-electric prestressing

We know that, stretched tendons are used in prestressed concrete. Stretching of tendons may be accomplished by using jacks or by other means. Thermo-electric prestressing is just another method of stretching the tendon wiers. We know that if we increase the temperature of a metal, it expands. As the name suggests, in Thermo-electric prestressing, temperature of tendon wires is increased by passing electric current for a short duration. This temperature increase, taking place within 3-5 minutes, may be of an order of 300-400°C. The bars, which may undergo an expansion of about 0.4-0.5% in length, try to shorten at cooling butare checked by fixed anchors at the two ends. 


Related Discussions:- What is thermo-electric prestressing

Hill roads, functions of breast wall& scupper

functions of breast wall& scupper

P.h.e, procedure for designing of sewage scheme

procedure for designing of sewage scheme

Define ways of providing the anti slip device - by bolting, Define Ways of ...

Define Ways of providing the anti slip device - By Bolting? The elastomeric bearing can be vulcanised with a stainless steel outer plate. The stainless steel plate is provided

Between capping beams and ground beams for piles, Question What is majo...

Question What is major disparity between capping beams and ground beams for piles? Answer Capping beams for piles plan to transferring loads from directly spaced c

States of stress - principal stresses, States of stress - principal stresse...

States of stress - principal stresses: Now let us consider a few cases of solids of the similar material (mild steel) under various states of stress as display in Figure. The

Verify the void ratio and water content, Derive the relation among void rat...

Derive the relation among void ratio (e), specific gravity of particles (G) and moisture content at full saturation (w). A certain sample of saturated soil in a container weighs

Surveying, A pre- engineering base line was run down a very steep hill.rath...

A pre- engineering base line was run down a very steep hill.rather than measure horizontaily down hill with steel tape: surveyor measured the vertical angle with the theodolite and

Bricks, BRICKS Brick is obtained by moulding good clay into a block, wh...

BRICKS Brick is obtained by moulding good clay into a block, which is dried and then burnt. It is the oldest building block to replace stone. Manufacture of brick started havin

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd