What is thermo-electric prestressing, Civil Engineering

Assignment Help:

What is Thermo-electric prestressing

We know that, stretched tendons are used in prestressed concrete. Stretching of tendons may be accomplished by using jacks or by other means. Thermo-electric prestressing is just another method of stretching the tendon wiers. We know that if we increase the temperature of a metal, it expands. As the name suggests, in Thermo-electric prestressing, temperature of tendon wires is increased by passing electric current for a short duration. This temperature increase, taking place within 3-5 minutes, may be of an order of 300-400°C. The bars, which may undergo an expansion of about 0.4-0.5% in length, try to shorten at cooling butare checked by fixed anchors at the two ends. 


Related Discussions:- What is thermo-electric prestressing

Open chanel flow, A rectangular channel is 3 m in width and draws water fro...

A rectangular channel is 3 m in width and draws water from a lake. The channel slope is 0.001 and the Manning’s n is 0.0013. What will be the discharge in the channel when the lake

Light-weight aggregate prestressed concrete, Light-weight Aggregate Prestre...

Light-weight Aggregate Prestressed Concrete The use of  light-weight aggregate concrete for prestressed concrete construction is well established. The main advantage of  light-

California bearing ratio, California Bearing Ratio (CBR): The most wi...

California Bearing Ratio (CBR): The most widely used test for determining the supporting power of a soil for designing the thickness of pavements is the California Bearing Ra

Determine the factor of safety against overturning, A trapezoidal masonry r...

A trapezoidal masonry retaining wall 1 m wide at top and 3 m wide at its bottom is 4 m high. The vertical face is retaining soil (φ = 30°) at a surcharge angle of 20° with the hori

Ranging, defference between direct and indirect ranging..

defference between direct and indirect ranging..

Material engineering assignment, select three materials metal and non meala...

select three materials metal and non mealat at least one of the selected materials shold change its property

Calculate the benefit-cost analysis ratio, Calculate the Benefit-Cost Analy...

Calculate the Benefit-Cost Analysis Ratio A city engineer is deciding which of two alternatives to select.  If the interest rate is 10% per year, the Benefit-Cost analysis rat

Precast pile, when a precast pile is single point lifting and when double p...

when a precast pile is single point lifting and when double point lifting- what are the moment coefficient of them?

Methods of constructing roads in marshy areas, Methods of Constructing Road...

Methods of Constructing Roads in Marshy Areas: The following methods are adopted for constructing roads in marshy areas: (a) Removal of soft soil and replacement with good

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd