What is thermo-electric prestressing, Civil Engineering

Assignment Help:

What is Thermo-electric prestressing

We know that, stretched tendons are used in prestressed concrete. Stretching of tendons may be accomplished by using jacks or by other means. Thermo-electric prestressing is just another method of stretching the tendon wiers. We know that if we increase the temperature of a metal, it expands. As the name suggests, in Thermo-electric prestressing, temperature of tendon wires is increased by passing electric current for a short duration. This temperature increase, taking place within 3-5 minutes, may be of an order of 300-400°C. The bars, which may undergo an expansion of about 0.4-0.5% in length, try to shorten at cooling butare checked by fixed anchors at the two ends. 


Related Discussions:- What is thermo-electric prestressing

Cone, if the diameter of the base remains constant by what factor should th...

if the diameter of the base remains constant by what factor should the altitude be multiplied to produce a cone with twice volume as the original

Explain the design criteria for sedimentation basin, Explain the Design Cri...

Explain the Design Criteria Sedimentation basin Surface Loading rate (or overflow rate), Vo = Q/A (flow rate/surface area) Detention time t or ? = V/Q (Volume /Flow rate)

Rehabilitation of Concrete Roads, Step by step rehabilitation strategies wi...

Step by step rehabilitation strategies with drawing, figures, and illustrations

Water absorption test for precast concrete pipes, Purpose of carrying out w...

Purpose of carrying out water absorption test for precast concrete pipes Cement will mix with more water than is essential to ultimately combine during hydration of cement pas

Determine the specific gravity of solids, The Atterberg limits of a clay so...

The Atterberg limits of a clay soil are: Liquid limit = 63%, Plastic limit = 40%, and shrinkage limit = 27%. If a sample of this soil has a volume of 10 cm 3 at the liquid limit a

Calculate the amount of cubic yards of soil, A proposed building site requi...

A proposed building site requires 135,000-ft 3 of imported fill.  A borrow site is located 5-miles Northeast of the project site where the soil has a shrinkage of 16%.  The amount

Lock entrance - docks, Lock Entrance: Wet docks have lock entrances to...

Lock Entrance: Wet docks have lock entrances to overcome the high fluctuations in water level in the sea. Figure 7 gives a layout of a lock entrance. It consists of a lock cha

Define sulphate attack - underwater inspection of bridge, Define Sulphate A...

Define Sulphate Attack - underwater inspection of bridge? Cement contains a proportion of tricalcium aluminates, which takes part in the hydration process. These can react with

Influence of pressure in the soil, Q. Influence of Pressure in the Soil? ...

Q. Influence of Pressure in the Soil? Figure shows the stress state beneath a footing. The steady state situation prior to footing as well as qualitative variation of pressure

Shoes of prefabricated drains, Q. Shoes of prefabricated drains? Shoes ...

Q. Shoes of prefabricated drains? Shoes are generally installed in prefabricated drains for the below : (i)  It avoids the entry of soils in the mandrel by sealing it at the

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd