Q. Explain the process of Directed Track Maintenance?

DTM is a method to maintain the track is directed every day and not as a prescribed routine. DTM essentially consists of need based maintenance rather than routine periodical maintenance. Under this system track maintenance is done by proper identification of defects of the track geometry rectification of these defects under close supervision by attending the track at these isolated locations and there by maintaining the track to predetermined standards.


Related Discussions:- Explain the process of directed track maintenance

Gas welding be erected in upright position, Question Explain some reaso...

Question Explain some reasons why should acetylene gas cylinders used for gas welding be erected in upright position? Answer Acetylene gas is usually used for gas wel

Surface-protecting fenders and energy-absorbing fenders, Question What ...

Question What is main difference in application of surface-protecting fenders and energy-absorbing fenders ? Answer Surface-protecting fenders are fenders that make

Define friction pendulum bearing, Define Friction Pendulum Bearing? In ...

Define Friction Pendulum Bearing? In friction pendulum bearings, the lateral displacement is permitted at the interface of the bearing element between the superstructure and th

Properties of stones, Properties of Stones The following properties of ...

Properties of Stones The following properties of the stones should betake into account before choosing them for engineering works: Structure: The structure of the stone ca

Continuous beam reaction by equilibrium equation, Solve problem of continu...

Solve problem of continuous beam with equilibrium equation

Show suspended impurities in water, Q. Show Suspended Impurities in water? ...

Q. Show Suspended Impurities in water? The solid particles which are dispersed in water are referred as suspended Impurities. These are microscopic as under-

Importance of geotextiles and sand in reclamation works, Question What ...

Question What is main importance of geotextiles and sand in reclamation works? Answer For geotextiles used in recovery, they serve mainly subsequent two purposes

What is the safe bearing capacity of wide strip footing, A loading test was...

A loading test was conducted with a 300 mm square plate at depth of 1 m under the ground surface in pure clay deposit. The water table is situated at a depth of 4 m below the groun

How to design shape of guide bunds, Q. How to design Shape of guide bunds? ...

Q. How to design Shape of guide bunds? Alignment of guide bunds converging on the upstream was considered by Bell, Spring and Gales to allow for the waterway obstructed by pier

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd