Q. What is Injection moulding?

An important industrial method of producing articles of thermoplastics is injection moulding. The moulding material is loaded into a hopper from which it is transferred to a heating section by a feeding device, where the temperature is raised to

150 c to 370 c. and pressure is built up. The material melts and is forced by an injection ram at high pressure through a nozzle and sprue into a closed mould which forms the parts. The mould is in at least two sections, so that it may be spilt in order to eject the finished component. For the process to be competitive the mould must be fairly cool and consequently the mold must be cooled by circulating water. Injection moulding machines have a high production capacity: some can produce from 12 to 16 thousand parts per shift. This method is suitable for making parts within complex threads and intricate shapes, thin-walled parts etc.

The limitation of the process is:- Equipment of cylinder and die should be non- corrosive. Also, reliable temperature controls are essential. Injection moulding machines range in size from an injection capacity of 12,000 mm3 to 2,200,000 mm3. The locking forces are applied to be the mould usually by hydraulic means, and may vary from 0.1 MN to 8.0 MN or even more. The injection pressure may range from 100 MPa to 150 MPa.


Related Discussions:- What is injection moulding

Determine the slopes at free end - cantilever beam, Determine the slopes at...

Determine the slopes at free end - cantilever beam: A cantilever beam of length l carries a point load W at a distance l  /4 from free end. Determine the slopes at free end

Seismometer-accelerometer-accelerometer, Seismometer : this is a transduc...

Seismometer : this is a transducer in which signal is proportional to the displacement. Accelerometer : This is a transducer in which signals is proportional to the a

Calculate the time required to complete the job, Five jobs are performed fi...

Five jobs are performed first-on Machine-I and then on Machine-II. Time in hours taken by each job on each machine is given below :

Throttle valve-components of a carburettor , Throttle Valve: The throttle...

Throttle Valve: The throttle valves control the quantity of mixture supplied to the cylinder. This is controlled by throttle grip with the help of a cable. When we open throttle

Friction is undesirable, Friction is Undesirable: A friction is undesi...

Friction is Undesirable: A friction is undesirable at the time of ice skating or when the block is lifted or put down on the truck with the help of inclined plane. If friction

Four-stroke - single cylinder gasoline engine, A four-stroke, single cylind...

A four-stroke, single cylinder gasoline engine having a bore of 90 mm and stroke of 100 mm has a compression ratio 7. The relative efficiency is 55% when the shown specific fuel co

Explain about structural design of combined footing, Explain about structur...

Explain about structural design of combined footing. Structural Design of Combined Footing The rectangular and trapezoidal combined footings are designed assuming uniform so

Calculate strength coefficient - true stress and true strain, Calculate str...

Calculate strength coefficient: A copper specimen of 64 mm gauge length and 12.80 mm dia. was tested in tension. Following two diameters were recorded in the plastic range of

What is clad plate and overlay welding, Q. What is Clad plate and overlay w...

Q. What is Clad plate and overlay welding? Strip back cladding on clad plate a minimum of 5 mm (3/16") from the edges of weld preparation before welding on the backing plate.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd