What do you understand by Pressure line

If we determine the locations of resultant force at various sections of a pre-stressed beam, as in Example, we can draw a curve showing the locus of the points of application of the resultant force in any beam or structure. This locus of the resultant force is known as 'Pressure line'. 


Related Discussions:- What do you understand by pressure line

Process in terms of shrinkage of concrete, In bridge widening projects, mea...

In bridge widening projects, means of stitching is normally employed for connecting existing deck to a new deck. What are the problems that occur connected with this process in ter

Hill roads, functions of breast wall& scupper

functions of breast wall& scupper

Explain the rippl diagram or mass diagram, Explain the Rippl Diagram or Mas...

Explain the Rippl Diagram or Mass Diagram For a potable water reservoir, it is the simultaneous plots of the cumulative inflow and cumulative water consumption/demand, termed "

Formation of frost heave, Q. Formation of frost heave? In the past, it ...

Q. Formation of frost heave? In the past, it was believed that formation of frost heave was related to volumetric expansion of soil water which changed from liquid state to sol

Various operations involved in maintenance by beater packing, Q. Explain in...

Q. Explain in details the various operations involved in Through Packing - conventional Maintenance by beater packing. Explain the various operations as per the Permanent Way

Check rail on curve, Check Rail on Curve - Check Rails are basically p...

Check Rail on Curve - Check Rails are basically provided on sharp curves to reduce the lateral wear on the outer rail. They also prevent the outer wheel flange from mounting o

Incremental launching mode of bridge construction, In i ncremental launchin...

In i ncremental launching mode of bridge construction, what are ways adopted to increase sufficient resistance of superstructure during launching practice?

Calculate the initial height of the stockpile, On a 5-acre level terrain bu...

On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft sub-g

Solid block -calculating for design mix, Good evening sir, solid block''s d...

Good evening sir, solid block''s design mix calculated generally please explain and derive .

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd