In sampling silts orclays, Piston sampler is lowered into boreholes and piston is locked at bottom of the sampler. This stops debris from entering the tube prior to sampling. After reaching the sampling depth, piston is unlocked so that piston stays on top of the sample going into the tube. Prior to withdrawal of the sampler, piston is locked to prevent the downward movement and vacuum generated during movement of the piston from sampler's end aids in retaining the samples recovered. Sample recovery is increased by using Piston samplers.


Related Discussions:- What do you mean by piston sampler

Transportation engineering, distinguidh between alluvial and qasi alluvial ...

distinguidh between alluvial and qasi alluvial stream

Explain the fluid pressure at any point on the surface, Pressure at Any Poi...

Pressure at Any Point on the Surface of a Horizontal Plane  Fluid pressure is the same at any point on the horizontal plane because: 1.  The fluid specific weight is the sam

Water-bound macadam road construction for unpaved roads, how can I come up ...

how can I come up with the research on the water bound macadam road construction

How to calculate the combined stresses, Compute the stresses at top and bot...

Compute the stresses at top and bottom fibers in a simply supported pre-stressed concrete beam with a rectangular cross section, 250 mm wide and 450 mm deep, as shown in Figure, at

Hydraulics, what is hydraulic grid line

what is hydraulic grid line

#manholes, #how are manholes mantained

#how are manholes mantained

Concrete technology, chemical compositions of Rapid Hardening Cement

chemical compositions of Rapid Hardening Cement

How we can check caisson is stable or not, A box caisson, 10 m high, is 18 ...

A box caisson, 10 m high, is 18 m × 9 m at the base. The weight of the caisson is 9 MN and its centre of gravity is 4.2 m above the base. Check whether the Caisson is stable. If

Depth of boring for multi-storeyed building, Depth of Boring  for Multi-st...

Depth of Boring  for Multi-storeyed Building Peck has recommended that first drill hole is to be made up to depth at which the presence of a thick layer of soft clay with a hig

Fixed end moments, For fixed beam(say for example fixed with a point load a...

For fixed beam(say for example fixed with a point load at midspan) how did we end up getting P*L/8...??

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd