What are the long spam bridge girders, Civil Engineering

Assignment Help:

What are the long spam bridge girders

The pre-tensioned construction finds more use and application in the construction of those structural concrete members which are of small sizes and which are generally made in large numbers. The case of a Prestressed concrete railway sleeper is an example of such a type of member. Post-tensioned concrete members are usually big sized elements, such as long spam bridge girders.


Related Discussions:- What are the long spam bridge girders

Bridge, Explain economical span if bridges

Explain economical span if bridges

Calculate the diameter of the stockpile, 1. On a 5-acre level terrain build...

1. On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft su

Pumping at joints in concrete carriageway, Q. Pumping at joints in concrete...

Q. Pumping at joints in concrete carriageway? Pumping at joints in concrete carriageway takes place in the presence of the below factors: (i)  Fine-grained subgrade (ii)

Building classification, Why I is the missing after h and J is written in t...

Why I is the missing after h and J is written in the classification of building

Sealing moving cracks and non-moving cracks, Sealing moving cracks and non-...

Sealing moving cracks and non-moving cracks In developing a suitable method to seal up cracks detected on concrete surface, it's of paramount importance to conclude if further

Important items during level crossing inspection, Q.7.- Write the important...

Q.7.- Write the important items to be inspected during level Crossing inspection. How do you take census of traffic at level crossing. Ans.-Important items to be inspected duri

Energy absorbed in heeling during vessel berthing, Q. Energy absorbed in he...

Q. Energy absorbed in heeling during vessel berthing? When a vessel   berths on a fender system at a pier, point of contact of berthing ship can be below or above the centre of

Track design for line speed improvements, The objective of this module is:-...

The objective of this module is:- For the student to identify the track design issues and there relationships that will need to be considered in the development of a feasibil

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd