The various causes of settlement are:

1) increasing load on the surrounding soil deposit,

2) excavation,

3) lowering of water table,

4) vibration in the vicinity of the structure.

5) reduction in volume of the soil caused by the weight of the building,

6) deterioration of foundation concrete, and

7) soil getting saturated with structural loading on top.


Related Discussions:- What are the causes of settlement

Finite Element Method formulation, 1. [6 marks] Treating the bar illustrate...

1. [6 marks] Treating the bar illustrated above as being a one dimensional axial bar where plane sections remain plane and parallel, analyse the bar using the Galerkin finite eleme

Hexagon, how to draw a regular hexagon using semicircle method

how to draw a regular hexagon using semicircle method

Binder, Binder: Normally 60/70 penetration grade, and provides cohesio...

Binder: Normally 60/70 penetration grade, and provides cohesion to the mixture and increases its stability. The mix design is done by the Marshall test, in which a specimen

Calculate the percent grade of line, 1. The topography of a local valley is...

1. The topography of a local valley is shown. The horizontal distance between point P and Q is 11,456-ft. The percent grade (%) of line P-Q .     2. Based on the info

State the angle of inclination of the failure plane, The stresses at failur...

The stresses at failure on the failure plane in a cohesionless soil mass were: Shear stress = 4 kN/m 2 ; normal stress = 10 kN/m 2 . Verify the resultant stress on the failure plan

Explain the variable conditions of river flow - bridges, Explain the Variab...

Explain the Variable Conditions of River Flow and Health State? The variable conditions of river flow and health state of structure demands constant supervision.  Although scou

Application of quadratic equation, list some applications of quadratic equa...

list some applications of quadratic equation in civil engineering

Shear slump and collapse slump in slump tests, Question What is sign of sh...

Question What is sign of shear slump and collapse slump in slump tests? Answer There are three varieties of slump that might occur in slumps test, specifically, slump, shear

Define the finish to finish activity, A finish-to-finish activity is best d...

A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti

Minimum volume of sump volume for pumps, Minimum volume of sump volume for ...

Minimum volume of sump volume for pumps Maximum pumping rate = Q P Volume of sump = V Inflow Rate = Q i Cycle Time T c = t 1 + t 2 t 1 = V / Q P - Q i t 2

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd