Q. What are Service reservoirs?
Service reservoirs, other than normal reservoirs are provided due to the subsequent reasons:
(i) In case of breakdown of pumping stations and water treatment plants, it offers a temporary storage of water in emergency situation such as fire fighting.
(ii) Because the demand of water supply from customers differs with time, provision of service reservoirs aims to balance fluctuation rate of water demand.
(iii)It offers a constant head of water to the distribution system under the design pressure.
(iv) In the event of occurrence of water hammer or surge at the time of rapid closure and opening of pumping stations, reservoir acts to attenuate the surge and performs similar to a surge tank.
(v) It results in a reduction of the size of pumps and trunk mains connecting to distribution system as pumps aren't required to directly cope with peak rates of water demand by introduction of service reservoirs. There is substantial cost savings arising from the use of smaller pumps and smallerpumping pipelines.
Q For a curve of 50, apex angle of 900 and transition length of 60m, calculate the parameters for setting out curve by a Theodolite for TTP, mid point of transition, CTP and a p
design
Q. Coatings at the back faces of abutments? There are many views on the necessity of application of protective coatings (can be in the form of two coats of paint) to the back f
Question In designing of watermain , regular practice is to use supple iron for pipe size less than 600mm and to use steel for pipe size additional than 600mm. Give some speci
why do we use effective depth ''d'' in calculating the shear capacity of uncracked Concrete beam. If it is uncracked, why cant we use the full depth ''D''.
how prepared for surveying?
A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti
built in truss
The state of stress at a point is given through the stress components sx = 70 MPa, sy = 10 MPa, and txy = - 40 MPa. Using Mohr''s circle find (i) Principal stresses, and (ii) Princ
Q. Explain Gap Survey and adjustment of Gap? Gap survey and rectification of gaps is to be carried out, in stretches where track develops excessive creep jammed joints, sun kin
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd