given A,B,C,and D are four plotted points at 2 centimeter apart and their ground reduced levels are 57.5 meter 63.2 meter 68.2 meter and 59.2 respectively.it is required to draw co
how do i Setting up The total station theodolite?
where i can get the tools of different types of measerments of differents elements of construction?
State the term - Post-tensioned concrete In Post-tensioned concrete construction, as shown in Figure, tendons are placed inside concrete and stretched after concrete has attai
A sample of clay taken from a natural stratum was originated to be partially saturated and when tested in the laboratory gave the following results. Calculate the degree of saturat
Explain Rapid Mixing Tank For the chemical reactions to occur, the chemicals must be mixed with water for both coagulation and softening we need mixing of chemical wi
Determine the Steps for routine inspection? A routine inspection should normally include: - A Level I inspection on 100% of the underwater portion of the structure to determ
what is the uses of mean mode and medain in civil engineering
Immersed tube method for underwater crossing includes the following basic construction steps: (i) Prefabricating long tunnel units (concrete orsteel shell) in a dry-dock or shi
cold driven rivet
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd