Explain the Activitated Sludge (Aeration Tank)?

The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation process in the activated sludge basin. This basin is also referred as aeration tank and the process is known as suspended growth process. The incoming waste to the activated sludge basin is composed of inorganic and organic solids. The organic portion of the incoming waste is responsible for the BOD and it represents the Food (F) for the microorganisms in the activated sludge basin.

The solids in the activated sludge basin are called mixed liquor suspended solids (MLSS). These solids are composed of an organic (MLVSS) and an inorganic part (MLFSS). The MLVSS is often considered to represent the microorganisms in the activated sludge basin. The stabilized organic solids are removed in the secondary sedimentation basin. Most of stabilized solids are returned or recycled to the activated sludge basin. Part of the stabilized solids is wasted each day. The wastewater from the aeration tank then flows over the secondary sedimentation basin (where the solids have been removed) and to the disinfection basin and then discharged to the receiving stream.


Related Discussions:- Explain the activitated sludge (aeration tank)

Strength of materials, distribution of shear stress in triangular section

distribution of shear stress in triangular section

Sketch typical complete grain-size distribution curves, Sketch typical comp...

Sketch typical complete grain-size distribution curves for (i) well graded soil and (ii) uniform silty sand. Form the curves, evaluate the uniformity coefficient and effective size

Railway drawings, section of railway tracks in india ,all dimensions in met...

section of railway tracks in india ,all dimensions in meters

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

R.c.c, solution of point of contraflexure

solution of point of contraflexure

List the significant engineering classification system, How do you distingu...

How do you distinguish among clay and silt in the field? State the purpose of identification and categorization of soils. List any three significant engineering classification syst

Distortion energy theory, Distortion energy theory: Let us now conside...

Distortion energy theory: Let us now consider the solid shown in Figure. (a)        By inspection we may see that the solid is safe according to principal stress theor

Define the types of sedimentation, Define the Types of Sedimentation 1....

Define the Types of Sedimentation 1. Type I Particles that settle discretely (settle as individual particles) sand, grit Pre-sedimentation for sand prior to co

Determine the limit state of serviceability, Determine the Limit State of S...

Determine the Limit State of Serviceability Cracking Cracking of concrete should not affect the appearance or durability of the structure. The criteria of limit state of cracki

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd