The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation process in the activated sludge basin. This basin is also referred as aeration tank and the process is known as suspended growth process. The incoming waste to the activated sludge basin is composed of inorganic and organic solids. The organic portion of the incoming waste is responsible for the BOD and it represents the Food (F) for the microorganisms in the activated sludge basin.
The solids in the activated sludge basin are called mixed liquor suspended solids (MLSS). These solids are composed of an organic (MLVSS) and an inorganic part (MLFSS). The MLVSS is often considered to represent the microorganisms in the activated sludge basin. The stabilized organic solids are removed in the secondary sedimentation basin. Most of stabilized solids are returned or recycled to the activated sludge basin. Part of the stabilized solids is wasted each day. The wastewater from the aeration tank then flows over the secondary sedimentation basin (where the solids have been removed) and to the disinfection basin and then discharged to the receiving stream.
Q. Differences between open shield and closed shield? Open shield type TBM refers to those providing lateral support only. They can be further classified into single shield and
Enumerate the term - Failure Due to Crushing of Concrete Over reinforced pre-stressed concrete members, provided with a large amount of pre-stressing steel or relatively small
what you mean by civil engineering
define and types
please give solved problems about sewer design
Q. How can a temporary diversion to laid a cross flowing river in case of disruption to rail traffic over a major bridge lasting over 6 months. Ans.- Temporary diversion
difference between raft and pile foundation question..
Construction of Embankment: The following steps describe embankment construction : (a) The ground is cleared and grubbed and all vegetation, grass, roots, etc. are removed
full history
steps to analysis a portal frame with sway condition
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd