Explain the Activitated Sludge (Aeration Tank)?
The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation process in the activated sludge basin. This basin is also referred as aeration tank and the process is known as suspended growth process. The incoming waste to the activated sludge basin is composed of inorganic and organic solids. The organic portion of the incoming waste is responsible for the BOD and it represents the Food (F) for the microorganisms in the activated sludge basin.
The solids in the activated sludge basin are called mixed liquor suspended solids (MLSS). These solids are composed of an organic (MLVSS) and an inorganic part (MLFSS). The MLVSS is often considered to represent the microorganisms in the activated sludge basin. The stabilized organic solids are removed in the secondary sedimentation basin. Most of stabilized solids are returned or recycled to the activated sludge basin. Part of the stabilized solids is wasted each day. The wastewater from the aeration tank then flows over the secondary sedimentation basin (where the solids have been removed) and to the disinfection basin and then discharged to the receiving stream.
State the term - Post-tensioned concrete In Post-tensioned concrete construction, as shown in Figure, tendons are placed inside concrete and stretched after concrete has attai
Ask question #Explalin a joint frame by stiffness method
Calculate the Total Duration for the Four Activity Project Solution: Scheduling work activity has associated time duration. The durations shown in the Table were e
incoming water contains 15 mg/L as a substance
Evaluation of various reports regarding the effects of earthquake on spatial trusses History and static In this section we aim to provide a summary report of what was happ
Are diaphragms necessary in designing of concrete box girder bridges ?
Determine the stage of Cracking moment of pre-stress At the stage of transfer of pre-stress in the pre-stressed beam element, only the pre-stressing force and the self weight
Reason in checking the ratio (i.e. design flow to full-bore flow > 0.5) in circular pipe design For checking of self-cleansing velocity for pipes, there is another criterion t
Question What are main disparities in design between regular precast concrete pipes and pipes used for pipe jacking ? Answer For pipes used for pipe jacking, they h
can we provide base isolation for high rise buildings ? Can we provide it for diagrid structures? if; yes Up to which no of storeys
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd