Explain the activitated sludge (aeration tank), Civil Engineering

Assignment Help:

Explain the Activitated Sludge (Aeration Tank)?

The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation process in the activated sludge basin. This basin is also referred as aeration tank and the process is known as suspended growth process. The incoming waste to the activated sludge basin is composed of inorganic and organic solids. The organic portion of the incoming waste is responsible for the BOD and it represents the Food (F) for the microorganisms in the activated sludge basin.

The solids in the activated sludge basin are called mixed liquor suspended solids (MLSS). These solids are composed of an organic (MLVSS) and an inorganic part (MLFSS). The MLVSS is often considered to represent the microorganisms in the activated sludge basin. The stabilized organic solids are removed in the secondary sedimentation basin. Most of stabilized solids are returned or recycled to the activated sludge basin. Part of the stabilized solids is wasted each day. The wastewater from the aeration tank then flows over the secondary sedimentation basin (where the solids have been removed) and to the disinfection basin and then discharged to the receiving stream.


Related Discussions:- Explain the activitated sludge (aeration tank)

#title.Mr., What are the Desirable Characteristics of a Pavement in highway...

What are the Desirable Characteristics of a Pavement in highway engineering

Plane table, what is traversing plane table?

what is traversing plane table?

Calculate the invert elevation of the sewer pipe, 1. The center line elevat...

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c

Determine the stresses set up in the brass, Determine the stresses set up i...

Determine the stresses set up in the brass: A compound bar is constructed from three bars 50 mm wide by 12 mm thick fastened together to form a bar 50 mm wide by 36 mm thick.

Survey, explain ranging and reciprocal ranging

explain ranging and reciprocal ranging

Surveying, length of the line measured with 20m chain found to be 250m.calc...

length of the line measured with 20m chain found to be 250m.calculate true length if the chain was 10cm long

Define project schedule financial analysis, The 6 monthly payment applicati...

The 6 monthly payment application for the construction of a $70,000,000 University dormitory is analyzed and the summary accounting show: the budgeted cost of work performed is $14

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd