WELDING PROCEDURE AND PERFORMANCE QUALIFICATION


A total quality assurance scheme, embracing all aspects of manufacture would have necessarily made all attempts to ensure qualification of all the resources with respect to a specified work environment. Right from raw material delivery conditions, to the commissioning of  product, all the facilities and systems including man power are subjected to listing and approvals are obtained by conducting qualifying tests, whenever necessary.

General Requirements as Specified in Contractual Documents


Depending on the type of construction,  the broad welding procedure specifications are usually drawn. A list of general parameters observed for such qualifications are listed below:

  1. Scope of work and code by which the work is covered, etc.
  2. Welding processes employed.
  3. Base metals specifications and applicable type, classification and composition of filler rods and weldment.
  4. Type of current and current range.
  5. Welder qualification requirements
  6. Joint designs and tolerances.
  7. Joint preparation and cleaning of surfaces for welding.
  8. Tack Welding.
  9. Joint welding details
  10. Position of welding involved at factory and at site.
  11. Preheat, interpass and post heat temperatures.
  12. Peening.
  13. Heat input electrode run length.
  14. Post weld heat treatment.
  15. Repair of welds.
  16. Inspection quantum and stages acceptance levels.

 


Related Discussions:- Welding procedure and performance qualification

A damped single degree mass-spring system, the spring k2 is attached to a b...

the spring k2 is attached to a base that is moving vertically with displacement y=yo sin(wt).assume x>y.derive the equation of motion .find the natural frequency and derive the ste

Discover the maximum torque, Discover the maximum torque: Discover the...

Discover the maximum torque: Discover the maximum torque that may be transmitted by the shaft of 400 mm diameter, if the shear stress is not to exceed 50 N/mm 2 . Solution

Engfine, how we made parts of engine

how we made parts of engine

Show seismic loads for ground supported equipment, Q. Show Seismic Loads Fo...

Q. Show Seismic Loads For Ground Supported Equipment? V = C s W is the governing equation for horizontal seismic base shear of ground supported equipment. C s  = 1.2A v S/(RT

Processes , example on operation sheet?

example on operation sheet?

Open belt drive, Open belt drive: An open belt drive connects the two...

Open belt drive: An open belt drive connects the two pulleys 120cm and 50cm diameter on parallel shafts which are apart 4m. The maximum tension in belt is 1855.3N. Coefficien

Calculate the natural frequency of the system, (a) A mass of 1 kg is to be ...

(a) A mass of 1 kg is to be supported on a spring having a stiffness of 9800N/m. The damping coefficient is 5.9 N-sec/m. Calculate the natural frequency of the system. Determine al

Cooling period of furnace pipe, We shutdown our furnace and always encounte...

We shutdown our furnace and always encountered crack on our piping at the weld joints. I investigated that upon shutdown the furnace cracking, our maintenance immediately remove th

Steel ball v/s cotton ball, steel ball v/s cotton ball of same weigt which ...

steel ball v/s cotton ball of same weigt which is easy to lift

Submerged arc welding, SUBMERGED ARC WELDING The optimum performance of w...

SUBMERGED ARC WELDING The optimum performance of welded vessels and structures in service have led to the full exploitation of automatic welding processes. This arc welding is on

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd