Water absorption test for precast concrete pipes, Civil Engineering

Assignment Help:

Purpose of carrying out water absorption test for precast concrete pipes

Cement will mix with more water than is essential to ultimately combine during hydration of cement paste. Some voids will be left behind after the hydration process that affects the durability and strength of concrete. With the presence of air voids in concrete, it's vulnerable to penetration and attack by aggressive chemicals. Good quality concrete is characterized by having minimal voids left by excess water and consequently water absorption test for precast concrete pipes is adopted for checking the quality of concrete in terms of imperviousness and density.


Related Discussions:- Water absorption test for precast concrete pipes

Define dupuit equations for unconfined aquifers, Define Dupuit Equations fo...

Define Dupuit Equations for Unconfined Aquifers Using natural log: Q = ΠK((h 2 ) 2 - (h 1 ) 2 )/ln(r 2 /r 1 )     Using log 10 : Q = K((h 2 ) 2 - (h 1 ) 2 )/((1,055)l

Calculate the final volume of the compacted soil, 1. 130,000-yd 3 of banke...

1. 130,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%.  The final volume of the compacted

Baur leonhardt system, What is the special feature of this system rather th...

What is the special feature of this system rather than other?? What do you mean by principal of looping system?

Timer, grading classification

grading classification

Surveying, How to read verniers and main scale readings on theodolite of 10...

How to read verniers and main scale readings on theodolite of 10"?

Show the concrete pressure on formwork, Q. Relation of pouring rate and tem...

Q. Relation of pouring rate and temperature with concrete pressure on formwork Freshly placed concrete exerts pressure on formwork at the time of the placing operation. It's i

Determine the grade rod reading at station, A section view of a proposed ro...

A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft

Concrete, what do you mean by harsh condrete mix or because of what concret...

what do you mean by harsh condrete mix or because of what concrete mix becomes harsh?

Matrices, How to invert a matrix

How to invert a matrix

Define the predominant factor in atmospheric corrosion, Define the Predomin...

Define the Predominant factor in atmospheric corrosion? The predominant factor in atmospheric corrosion in areas located above splash zone is moisture as there is an excess ava

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd