Vibration in structures – resilient bearings, Civil Engineering

Assignment Help:

Q. Vibration in structures - resilient bearings?

When railway tunnels are built close to buildings, ground-borne vibration is transmitted to buildingsthrough compression and shear waves [36]. When structural members (such as wall) of a building have natural frequencies similar to frequency at the source, response of structures would be magnified. This effect is evenmore major when building is designed with small number of movement joints. Therefore vibration can be felt inside the building and noise associated with this vibration is produced. To evade this, vibration isolation can be implemented sometimes by providing resilient bearings at column heads in buildings.


Related Discussions:- Vibration in structures – resilient bearings

Sub-surface drainage, Sub-surface Drainage: Sub-surface drainage is i...

Sub-surface Drainage: Sub-surface drainage is intended to take away the water seeping through the pervious layers of the soil, causing a high water table, or in cut slopes of

Two way slab, how can i design reinforcement for a two way slab

how can i design reinforcement for a two way slab

Working from whole to part, explain the principle of working from whole to ...

explain the principle of working from whole to part, as used in surveying

Geological classification of stones, Geological Classification Based on...

Geological Classification Based on their beginning of formation stones are classified into 3 main groups-Igneous, sedimentary and metamorphic rocks. Igneous Rocks: Thes

Determine the elastic settlement of a rectangular foundation, Determine the...

Determine the elastic settlement of a rectangular foundation, 6 m × 12 m, on a uniform sand with E = 20,000 kN/m 2 and Poisson's ratio,   = 0.2. The contact pressure is 200 kN/m 2

Engineering mechanics, Characteristics of couple #Minimum 150 words accepte...

Characteristics of couple #Minimum 150 words accepted#

Solid block -calculating for design mix, Good evening sir, solid block''s d...

Good evening sir, solid block''s design mix calculated generally please explain and derive .

Explain a critical path - construction management, Explain a Critical Path ...

Explain a Critical Path The series of activities which determines the earliest possible date of project completion Usually defined as those activities with minimal or

Vibrocoring in marine ground investigation, Vibrocoring in marine ground in...

Vibrocoring in marine ground investigation If only shallow marine ground geotechnical information is essential for design purpose, vibrocoring is certainly a good choice for s

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd