what is the factor of a^4-7a^2+7 ?

Related Discussions:- #title.factoring expression

Statics - rigid body of equilibrium, The ball of a trailer hitch is subject...

The ball of a trailer hitch is subjected to a force F. If the failure occurs when the moment of point F around point A reaches 11250 in lbs, determine the largest value F may have

Explain the mechanism of compaction by paver, Q. Explain the Mechanism of c...

Q. Explain the Mechanism of compaction by paver? Mechanism of compaction by paver, steel-wheeled roller and pneumatic tire rollers Paver, steel-wheeled roller and pneumat

Define superposition method, Define Superposition Method  1. Remove eno...

Define Superposition Method  1. Remove enough redundant supports to reduce the structure to a statically determinate condition 2. Calculate the deflections at the previous l

Tack coat – emulsified asphalts vs cutback asphalts, Tack coat - emulsified...

Tack coat - emulsified asphalts vs. cutback asphalts Emulsified asphalt is a suspension of asphalt in water by employing an emulsifying agent that imposes an electric charge o

Cover depths of jacking pipes, Question While pipe jacking or microt...

Question While pipe jacking or microtunneling , it is usually accepted that cover depths of jacking pipes cannot be also shallow as in less than 2D where D is the diameter o

Explain the term - non-bonded prestressed concrete, Explain the term - Non-...

Explain the term - Non-bonded Prestressed Concrete It is a method of construction in which the tendons are not bonded to the concrete. Ducts, housing the tendons, are not grout

Retaining walls, Retaining Walls: Needed to retain the fill portion, a...

Retaining Walls: Needed to retain the fill portion, and generally constructed in dry stone masonry with pucca bunds (Figure). Figure: Typical Design for a Retaining

Calculate the total duration for the four activity project, Calculate the T...

Calculate the Total Duration for the Four Activity Project Solution:      Scheduling work activity has associated time duration. The durations shown in the Table were e

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd