Test Analysis:
First new sand blasting machine prototype had arrived Asia. Installation of the machine had been carry out by external vendor. We test run the machine and the result was not meeting the level of expectation.
The test was carried out, whereby the sand blast nozzle shown smooth vertical movement and the speed of blast is capture by pressure gauge 3.0 bars. We can see minor vibration from machine and low noise produce from sand blast process. In sand blasting process is very stress on stabilizing condition and smoothen of the nozzle movement.
We also need to consider the blasting room design. If the design did not build out aerodynamically it will cause whatever blast will be bounce back and worst case it would damage our product. There is also a need on the distance between blasting nozzle and work piece varies according to the desired blasting intensity.
common formula for first law of thermodynamics #Minimum 100 words accepted#
Q. Mechanical Design Calculations? The Mechanical Design Engineer/Specialist shall be responsible for mechanical design calculations that are required to ensure that the end pr
What is the velocity of the crosshead - crank: In the slider crank mechanism shown in Figure, the crank is rotating clockwise at 120 revolution/minute. What is the velocity of
(a) The following forces (all pull) act at a point : (6) (i) 20 N North-East (ii) 25 N due North (iii) 20 N 30o East of South (iv) 15 N due East (v) 30 N 60o South o
Sketch neatly two views of a footstep braring for supporting a 50mm diameter vertical shsft. Give important dimensions
Product Holon The product holon serves as the knowledge base for the manufacturing system. This can be portrayed like an information server to the other holons concerned in the
Q. What is IFC in project management? This revision is to be used as a basis for preparing detailed design for final checking of IFC drawings by other disciplines, for incorpo
Illustrate theories in planning a machining sequence A component requires several machining operations to bring it to a final shape. The sequence of these operations are arran
what is shear stress
Advantage of flash butt welding 1. Higher weld strength 2. Higher production rate 3. Better heat concentration 4. Simple weld surface preparation 5. Wide range of m
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd