Essentially sub-base for a concrete carriageway is provided for the below reasons:
(i) It provides aneven and smooth surface between the subgrade and concrete slab. This stops the problem of uneven frictional stresses arising from the uneven interface under shrinkage and thermal movement. It also enhances the uniformity of support provided to concrete slab to improve even distribution of wheel load to subgrade.
(ii) For heavily trafficked carriageways with frequent occurrence of a high water table, it serves to stop the occurrence of mud pumping on clayey and silty subgrade. Loss of these clayey soils by carriageway joints like contraction and expansion joints will cause structural failure of concrete slab under heavy traffic load.
Stiffness of concrete slab accounts for the strength of rigid road structure. It is generally uneconomical to use sub-base as part of the strength provider since a much thicker layer of sub-base has to be adopted to decrease the thickness of concrete slab by a small amount. Henceforth it is more cost-effective to increase the depth of concrete slab instead to enhance foundation strength in order to achieve a higher load-carrying capacity of concrete pavement.
What is the head loss in 350 ft of 12 inch diameter 20 years old cast iron pipe carrying 1.2 MGD?
Q. Natural rubber and Synthetic rubber? There is often a confusion between the words elastomer and neoprene. While elastomer refers to the generic name of the rubber, neoprene
Distortion energy theory: Let us now consider the solid shown in Figure. (a) By inspection we may see that the solid is safe according to principal stress theor
A retaining wall 9 m high retains granular fill weighing 18 kN/m 3 with level surface. The active thrust on the wall is 180 kN per metre length of the wall. The height of the wall
Question During deep excavation , neighbouring ground water table is drawn down that might affect settlement of nearby buildings. What is remedial proposal to rectify situatio
Point of virtual fixity and critical length of lateral loading for piles Some engineers can get confused about the difference between the two terms which are point of virtual
Explain the Operating Point - Pumping System Intersection of the characteristic curve and the system curve. This is the head and flow rate data for the pump "operation". The op
Shear distribution for I section
In a hydrometer analysis, the corrected hydrometer reading in a 1000 ml uniform soil suspension at the start of sedimentation was 28. After a lapse of 30 minutes, the corrected hyd
Uses of Bricks In the following civil works Bricks are used: a. in building blocks. b. For lining of ovens, chimneys and furnaces. c. As aggregates in providing water
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd